BLD-Wall Bracing | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Russ VanWagenen
|
BLD-Conference | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | DONE |
Mike Jordan
|
|
|
Mike, ideally prior to 10am but just give me a heads up prior and I’ll be there. Thanks Phone #: ###-#### Inspection requested via web by Russ VanWagenen. Provided GA file is still incorrect.
|
BLD-Foundation | 7/6/2020 | 7/7/2020 | 7/7/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 7/5/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo. A correction notice was also issued to have architect provide updated 2hr. wall detail. Provided detail and WP do not match.
|
Issue PAID IN FULL permit | | | 6/29/2020 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/29/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/25/2020 | | DONE |
|
|
|
|
Telephone call | | | 6/25/2020 | | DONE |
|
|
|
PERMIT ISSUED BY MISTAKE. NOT ALL FEES PAID. PLACED BACK IN PND STATUS LET CONTRACTOR KNOW
|
CHANGE STATUS TO (RDY) | | | 6/25/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 6/24/2020 | | |
|
|
|
|
Plan assigned to (D_S) Debbie | 5/20/2020 | 5/20/2020 | 6/24/2020 | | DONE |
Debbie Sanine
|
|
|
|
Routing - MECHANICAL | 6/24/2020 | | 6/24/2020 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2020 | | DONE |
Debbie Sanine
|
|
|
|
Permit Ready to Issue | | | 6/24/2020 | | DONE |
|
|
|
MET Do not issue without the other
|
Routing - MECHANICAL | 6/17/2020 | | 6/17/2020 | | FAIL |
Troy James
|
|
|
still need revised manual j report for current job.
|
Routing - PLAN CHECK | 6/17/2020 | | 6/17/2020 | | PASS |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 6/16/2020 | | 6/16/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Routing - MECHANICAL | 6/9/2020 | | 6/9/2020 | | FAIL |
Troy James
|
|
|
Previous correction has not been addressed.
|
1st review completed | | | 6/4/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Routing - PLAN CHECK | 5/20/2020 | | 6/4/2020 | | FAIL |
Debbie Sanine
|
|
|
|
Routing - PLANNING | 5/20/2020 | | 5/28/2020 | | PASS |
Josh Wilson
|
|
|
|
Route to Impact Fee Review | 5/20/2020 | 5/23/2020 | 5/21/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 5/20/2020 | | 5/21/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 5/20/2020 | | 5/21/2020 | | FAIL |
Troy James
|
|
|
Applicant uploaded a ACCA report tha was stamped for a previous project. Need new ACCA report.
|
Plans ACCEPTED BY PLAN TECH | | | 5/20/2020 | | DONE |
|
|
|
|
Intake Approval | | | 5/20/2020 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/20/2020 | | 5/20/2020 | | PASS |
Candy A. Nichols
|
|
|
TOWNHOUSE
|
Intake Approval | | | 5/14/2020 | | FAIL |
|
|
|
Not all corrections were met.
Please re-upload any drawings or documents that have pervious permit approval stamps on them. We need clean new documents and drawings.
|
Intake Approval | | | 5/14/2020 | | FAIL |
|
|
|
3rd Prescreen 5-14-20:
1. Drawings and documents that have previous approval stamps and "red-lines" from plan reviewers are not valid for intake.
Please re-upload clean and markup free drawings for review. For example, the approved stamp on the Manual J's at the top right must be taken off.
2. Please show Electrical plan for both houses.
|
Intake Approval | | | 5/13/2020 | | FAIL |
|
|
|
Couldnt do a full prescreen
1.Please see person email that was sent. (if its a townhome please fill out the app that was sent so we can create another building permit to go along with this permit)
2. Please re upload new Manual J's with the correct addresses on them and ones that have not been approved before.
3. Please show the ELE on both sides of the houses.
4. Please provide a chart for the prescriptive energy code (checked with the plan reviewer and we need a chart, not just it written in the cross section)
|
Telephone call | | | 5/13/2020 | | DONE |
|
|
|
Emailed Ward to confirm this is a townhouse and to fill out a second application, so we can create a second permit.
|
Application received | | | 5/12/2020 | | DONE |
|
|
|
Application submitted via PDS Online on May 12 2020 8:19PM
|