Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD20-01553
StatusIssued
Name BLG ENTERPRISES LLC
Site Address 1533 N PINEVIEW LN
Project NameEncore Townhouses
Customer NumberBLD20-01572
ePlanReviewYes
Description
(TWO PERMITS FILED UNDER BLD20-01553)**PRESCRIPTIVE ENERGY REQUIREMENT**Permit for the construction of a new 1513 sq. ft., two story (first story 674 sq. ft., second story 839 sq. ft) townhouse with 3 bedrooms, 2.5 bathrooms, approximately 141 sq. ft. of patio/porch and a 400 sq. ft. attached garage per the approved plans and any notations. C-1D zoning and setbacks per planning. D_S
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Wall Bracing8/10/20208/11/20208/11/2020APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Russ VanWagenen
BLD-Conference7/28/20207/29/20207/29/2020ADONE
DetailsMike Jordan
Mike, ideally prior to 10am but just give me a heads up prior and I’ll be there. Thanks Phone #: ###-#### Inspection requested via web by Russ VanWagenen. Provided GA file is still incorrect.
BLD-Foundation7/6/20207/7/20207/7/2020PPASS
DetailsMike Jordan
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo
BLD-Footing7/5/20207/6/20207/6/2020PPASS
DetailsMike Jordan
Phone #: 2089109404 >> Inspection requested via mobile web by Ricardo. A correction notice was also issued to have architect provide updated 2hr. wall detail. Provided detail and WP do not match.
Issue PAID IN FULL permit  6/29/2020 DONE
Inspection Record Card- Bld  6/29/2020 DONE
Issue PAID IN FULL permit  6/25/2020 DONE
Telephone call  6/25/2020 DONE
PERMIT ISSUED BY MISTAKE. NOT ALL FEES PAID. PLACED BACK IN PND STATUS LET CONTRACTOR KNOW
CHANGE STATUS TO (RDY)  6/25/2020 DONE
OVERRIDE  6/24/2020  
Plan assigned to (D_S) Debbie5/20/20205/20/20206/24/2020 DONE
DetailsDebbie Sanine
Routing - MECHANICAL6/24/2020 6/24/2020 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  6/24/2020 DONE
DetailsDebbie Sanine
Permit Ready to Issue  6/24/2020 DONE
MET Do not issue without the other
Routing - MECHANICAL6/17/2020 6/17/2020 FAIL
DetailsTroy James
still need revised manual j report for current job.
Routing - PLAN CHECK6/17/2020 6/17/2020 PASS
DetailsDebbie Sanine
Routing - PLAN CHECK6/16/2020 6/16/2020 FAIL
DetailsDebbie Sanine
Routing - MECHANICAL6/9/2020 6/9/2020 FAIL
DetailsTroy James
Previous correction has not been addressed.
1st review completed  6/4/2020 FAIL
DetailsDebbie Sanine
Routing - PLAN CHECK5/20/2020 6/4/2020 FAIL
DetailsDebbie Sanine
Routing - PLANNING5/20/2020 5/28/2020 PASS
DetailsJosh Wilson
Route to Impact Fee Review5/20/20205/23/20205/21/2020 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - Addressing5/20/2020 5/21/2020 PASS
DetailsDoug Chausow
Routing - MECHANICAL5/20/2020 5/21/2020 FAIL
DetailsTroy James
Applicant uploaded a ACCA report tha was stamped for a previous project. Need new ACCA report.
Plans ACCEPTED BY PLAN TECH  5/20/2020 DONE
Intake Approval  5/20/2020 PASS
Routing - PUBLIC WORKS5/20/2020 5/20/2020 PASS
DetailsCandy A. Nichols
TOWNHOUSE
Intake Approval  5/14/2020 FAIL
Not all corrections were met.
Please re-upload any drawings or documents that have pervious permit approval stamps on them. We need clean new documents and drawings.
Intake Approval  5/14/2020 FAIL
3rd Prescreen 5-14-20:
1. Drawings and documents that have previous approval stamps and "red-lines" from plan reviewers are not valid for intake.
Please re-upload clean and markup free drawings for review. For example, the approved stamp on the Manual J's at the top right must be taken off.
2. Please show Electrical plan for both houses.
Intake Approval  5/13/2020 FAIL
Couldnt do a full prescreen
1.Please see person email that was sent. (if its a townhome please fill out the app that was sent so we can create another building permit to go along with this permit)
2. Please re upload new Manual J's with the correct addresses on them and ones that have not been approved before.
3. Please show the ELE on both sides of the houses.
4. Please provide a chart for the prescriptive energy code (checked with the plan reviewer and we need a chart, not just it written in the cross section)
Telephone call  5/13/2020 DONE
Emailed Ward to confirm this is a townhouse and to fill out a second application, so we can create a second permit.
Application received  5/12/2020 DONE
Application submitted via PDS Online on May 12 2020 8:19PM