Conference | 12/21/2018 | 12/24/2018 | 12/24/2018 | P | DONE |
Eric Story
|
|
|
call 30 or 40 min ahead to meet // Aaron Smith ###-#### Discussed requiremnets of fixing and all install done by handyman, owner very capable of finishing job at hand
|
Permanent Service | 12/24/2018 | 12/24/2018 | 12/24/2018 | P | PASS |
Eric Story
|
|
|
call 30 or 40 min ahead to meet // Aaron Smith ###-#### p/s o/h rec ok
|
Permanent Service | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | FAIL |
Eric Story
|
|
|
call 30 mins ahead- Aaron Phone #: ###-#### 250 Grounding electrode system required to re-energize service
|
VOIDED CHANGE STATUS | | | 12/21/2018 | | DONE |
|
|
|
Per phone call from inspector Eric Story, electrical contractor will be doing work on service. // reopened permit and added branch circuts to permit per Aaron with Stars & Stripes said he is going to live in this house. ok per Daryl D. -leg
|
Override - Parcel Holds | | | 12/21/2018 | | |
|
|
|
|
Change Status to I | | | 12/21/2018 | | DONE |
|
|
|
|
Meeting | | | 12/21/2018 | | DONE |
|
|
|
parcel owner in office to add circuits to permit for work/repairs done to house. Aaron with Stars & Stripes said he is going to live in this house. ok per Daryl D. -leg
|
Override - Parcel Holds | | | 12/21/2018 | | |
|
|
|
|
Override - Parcel Holds | 12/20/2018 | 1/1/1900 | 12/20/2018 | | |
|
|
|
turning back on the power
|
Permanent Service | 12/10/2018 | 12/17/2018 | 12/17/2018 | P | CANC |
Eric Story
|
|
|
Richard Phone #: ###-####-not ready
|
Override - Parcel Holds | 12/10/2018 | 1/1/1900 | 12/10/2018 | | |
|
|
|
turn power back on
|
Application received | | | 12/10/2018 | | |
|
|
|
|
Override - Parcel Holds | | | 12/10/2018 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/10/2018 | | DONE |
|
|
|
|