General Inspection | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PASS |
Andy J. Long
|
|
|
Utility line replacement at depot complete. Disturbed area has been sodded. No loose dirt, construction materials, nor temporary BMPs at site. ESC permit finaled.
|
DOC - Permit Finaled | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PASS |
Andy J. Long
|
|
|
|
Random Inspection | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Michael Zawacki
|
|
|
WIP. All dirt contained inside perimeter controls. Some tracking over sidewalk between work area and sand pile.
|
Site Preparation | 10/13/2017 | 10/13/2017 | 10/16/2017 | P | PASS |
Michael Zawacki
|
|
|
Small disturbed area, doing horizontal bore. Exposed areas protected by gator guard on downhill slopes.
|
Issue & PRINT permit COM | | | 10/12/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/9/2017 | | DONE |
|
|
|
emailed Kyle that the permit is ready and that we need the inner office transfer
|
Application received | | | 10/2/2017 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/2/2017 | | 10/2/2017 | | DONE |
Andy J. Long
|
|
|
General ESC permit conditions apply.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2017 | | DONE |
|
|
|
|