DOC - Permit Finaled | 6/22/2018 | 6/22/2018 | 6/22/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/4/2018 | 4/4/2018 | 4/5/2018 | P | PASS |
Michael Zawacki
|
|
|
Building is up. All dirt is stored on site with existing backfill. Nothing leaving work area.
|
Site Preparation | 12/18/2017 | 12/18/2017 | 12/19/2017 | P | PASS |
Michael Zawacki
|
|
|
Call with questions - Curt Phone #: ###-####. Ditch along road has a berm protecting it. Using existing entrance and have a construction entrance for storage. Lot's of old stockpiled fill on site.
|
Permit Ready to Issue | | | 12/5/2017 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 12/5/2017 | | DONE |
|
|
|
|
Application received | | | 10/11/2017 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/11/2017 | | 10/11/2017 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid PD and RP designated. Site preparation required.
|