Site Final | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | PASS |
Andy J. Long
|
|
|
Bill Phone #: ###-####
Drainage from timber staging and loading area has been diverted to an onsite detention and seepage pond. Jersey barriers and geotextiles dam directs runoff to a channel leading to the pond. Rock check dams have been installed in ditch to slow velocity of water. Water no longer flows down slope to Production and airport drainage system. Silt fence perimeter along slope to remain installed. Will be removed by facility once it is no longer functional.
|
Routing - Erosion and Sediment | 5/15/2018 | | 5/15/2018 | | DONE |
Michael Zawacki
|
|
|
Approved, no site prep required.
|
Permit Ready to Issue | | | 5/15/2018 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2018 | | DONE |
|
|
|
Spoke with Dave informing him that this permit is ready and the fee amount due for issuance
|
Issue & PRINT permit COM | | | 5/15/2018 | | DONE |
|
|
|
|
Application received | | | 5/11/2018 | | |
|
|
|
|