Permit Information
Permit NumberESC18-00714
StatusFinaled
Name BRAD SIMPSON
Site Address 4800 S PRODUCTION AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Install ecology blocks, drain rock, check dams, and grooming the exisisting ditch to improve water channeling velocity.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/4/20186/4/20186/4/2018PPASS
DetailsAndy J. Long
Bill Phone #: ###-####

Drainage from timber staging and loading area has been diverted to an onsite detention and seepage pond. Jersey barriers and geotextiles dam directs runoff to a channel leading to the pond. Rock check dams have been installed in ditch to slow velocity of water. Water no longer flows down slope to Production and airport drainage system. Silt fence perimeter along slope to remain installed. Will be removed by facility once it is no longer functional.
Routing - Erosion and Sediment5/15/2018 5/15/2018 DONE
DetailsMichael Zawacki
Approved, no site prep required.
Permit Ready to Issue  5/15/2018 DONE
Telephone call  5/15/2018 DONE
Spoke with Dave informing him that this permit is ready and the fee amount due for issuance
Issue & PRINT permit COM  5/15/2018 DONE
Application received  5/11/2018