FIR-Aging Inspection | 9/27/2018 | 9/27/2018 | 9/28/2018 | | DEFR |
Jim Page
|
|
|
Email sent to Glenn Walker requesting a final acceptance test to be scheduled.
|
INSP-Sprinkler Rough-in | 1/6/2014 | 1/6/2014 | 1/7/2014 | P | PART |
Forrest France
|
|
|
Overhead work okayed for cover.
|
INSP-Sprinkler Rough-in | 11/7/2013 | 11/7/2013 | 11/7/2013 | P | PART |
Forrest France
|
|
|
Drop ceilings okay to cover at the remodel area
|
Permit Ready to Issue | | | 11/7/2013 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 11/7/2013 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 11/7/2013 | | 11/7/2013 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 11/1/2013 | | 11/5/2013 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 11/5/2013 | | 11/5/2013 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/5/2013 | | 11/5/2013 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/5/2013 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2013 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 11/1/2013 | | |
|
|
|
|
FIR-Aging Inspection | 8/10/2020 | 8/10/2020 | | | |
Jim Page
|
|
|
|