INSP-Final Inspection | 6/18/2020 | 6/18/2020 | 6/18/2020 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection is complete.
Call James when heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Supply line flush | 5/29/2020 | 6/1/2020 | 5/29/2020 | A | CANC |
Jim Page
|
|
|
Scheduled for 9am with Stacy at Suez. Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2020 | 5/27/2020 | 5/27/2020 | P | CANC |
Jim Page
|
|
|
Underground hydro. Ready any time, call James before heading out. Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
CHANGE STATUS TO (ISS) | | | 5/19/2020 | | DONE |
|
|
|
|
Plan assigned to (Stumbaugh) | 5/11/2020 | | 5/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 5/13/2020 | | 5/13/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
Review Time 1hr
No new devices
|
Permit Ready to Issue | | | 5/13/2020 | | DONE |
|
|
|
Do not issue-plan mod
|
Plan Modification Accepted | | | 5/11/2020 | | DONE |
|
|
|
Nate requested a plan mod
|
INSP-Sprinkler Rough-in/Hydro | 4/8/2020 | 4/9/2020 | 4/9/2020 | P | DONE |
Jim Page
|
|
|
Hydrostaic test for overhead fire sprinkler piping has been witnessed, no pressure loss observed at riser provided gauge.
Hydrostatic test Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | PASS |
Jim Page
|
|
|
Tenting corrections have been made, all tenting in place at time of inspection, cover is approved, sticker has been placed for approval.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/4/2020 | 3/4/2020 | 3/4/2020 | P | PART |
Jim Page
|
|
|
Rough in inspection is complete, piping between conditioned spaces approved for cover, tenting was not installed correctly in numerous areas, cover is not approved for piping that requires tenting.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 3/3/2020 | 3/3/2020 | 3/3/2020 | A | CANC |
Jim Page
|
|
|
Call Anthony before heading out. Rough to cover. Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|
Sprinkler Plan Check | 2/24/2020 | | 2/26/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Permit Ready to Issue | | | 2/26/2020 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/26/2020 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/24/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Sprinkler Plan Check | 1/30/2020 | | 2/7/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
1st review completed | | | 2/7/2020 | | FAIL |
Mark Stumbaugh
|
|
|
|
Intake Approval | | | 1/30/2020 | | PASS |
Mark Stumbaugh
|
|
|
|
Plan assigned to (Stumbaugh) | 1/30/2020 | | 1/30/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
Application received | | | 1/29/2020 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 29 2020 2:27PM
|