Final | 12/10/2019 | 12/11/2019 | 12/11/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Final | 12/10/2019 | 12/10/2019 | 12/10/2019 | P | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-T&P requires an air-gap above hub drain.
|
Final | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | FAIL |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Need to run T&P to an approved location.
|
Plumbing Rough-in | 7/8/2019 | 7/9/2019 | 7/9/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 7/3/2019 | 7/8/2019 | 7/8/2019 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Johansen Inspection cancelled from web by: Brian Johansen
|
Groundwork | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Groundwork ok to cover except outside shower. P-trap for outside shower needs to be 3' deep or change to a french drain.
|
Groundwork | 5/8/2019 | 5/9/2019 | 5/9/2019 | P | CANC |
Eric Strole
|
|
|
Phone #: ###-#### >> Inspection requested via web by Brian Johansen Inspection cancelled from web by: Brian Johansen
|
Issue PAID IN FULL permit | | | 4/29/2019 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/29/2019 | | DONE |
|
|
|
This permit was created on the web by Brian Johansen
|