Expired/Cancelled | 3/17/2014 | 3/17/2014 | 3/17/2014 | | FAIL |
Bob Archibald
|
|
|
No requests for required inspections. No activity or contractors on site has exceeded time limitations on permit since renewal.
|
BLD-Aging Inspection | 12/5/2013 | 12/5/2013 | 12/10/2013 | | NR |
Bob Archibald
|
|
|
No request for inspections. No new activity at site.
|
BLD-Aging Inspection | 9/5/2013 | 9/5/2013 | 9/9/2013 | | NR |
Bob Archibald
|
|
|
No request for inspection
|
BLD-Conference | 5/28/2013 | 5/29/2013 | 5/29/2013 | A | PEND |
Tony Young
|
|
|
status review,, 325 in charge of
|
BLD-Conference | 5/28/2013 | 5/29/2013 | 5/29/2013 | A | PEND |
Tony Young
|
|
|
status review
|
FIRE-Conference | 2/19/2013 | 2/21/2013 | 2/21/2013 | A | DONE |
Forrest France
|
|
|
On site conference with contractor regarding project related fire alarm and sprinkler trade work, finish schedule, plan review, conditions for occupancy, IFC and NFPA requirements.
|
BLD-Other | 2/19/2013 | 2/19/2013 | 2/19/2013 | A | PEND |
Bob Archibald
|
|
|
Conference with Noah on requirements to obtain letter of compliance on shell. No occupancy approved.
|
BLD-Aging Inspection | 12/4/2012 | 12/4/2012 | 12/11/2012 | | PEND |
Tony Young
|
|
|
|
DOC - Permit Expired | | | 2/4/2011 | | DONE |
Bob Archibald
|
|
|
Spoke with Brian, superintendant, and informed him of outstanding issues and that permit would have to be reactivated to obtain final inspection sign off.
|
BLD-Conference | 1/3/2011 | 1/3/2011 | 1/3/2011 | A | PASS |
Bob Archibald
|
|
|
Spoke with architect Larry Sundell and also left voice message with Bill Strack. Project completion required by January 31st or permit will be expired.
|
BLD-Conference | 11/15/2010 | 11/15/2010 | 11/15/2010 | P | FAIL |
Bob Archibald
|
|
|
Conference with Bradley (###-####) the superintendent and informed him that this permit must have a final inspection prior to January 1, 2011.
Failure to complete remaining items required for a final will result in expiration of permit
|
BLD-Aging Inspection | 11/8/2010 | 11/8/2010 | 11/9/2010 | | PEND |
Tony Young
|
|
|
325 is handling this
|
BLD-Aging Inspection | 9/8/2010 | 9/8/2010 | 9/9/2010 | | PEND |
Tony Young
|
|
|
325 in charge of
|
BLD-Aging Inspection | 7/7/2010 | 7/7/2010 | 7/7/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 5/7/2010 | 5/7/2010 | 5/7/2010 | P | PART |
Bob Archibald
|
|
|
Status unchanged only minor improvements.
|
BLD-Aging Inspection | 4/19/2010 | 4/19/2010 | 4/20/2010 | | PEND |
Tony Young
|
|
|
|
DOC - Permit Expired | 4/20/2010 | 4/20/2010 | 4/20/2010 | A | CANC |
Tony Young
|
|
|
|
BLD-Conference | 2/11/2010 | 2/11/2010 | 2/11/2010 | P | PART |
Bob Archibald
|
|
|
Discussed with new superintendant requirements for obtaining a final on shell permit. No noticable improvements since last inspection (1 worker).
|
BLD-Aging Inspection | 11/20/2009 | 11/20/2009 | 11/27/2009 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/9/2009 | 9/9/2009 | 9/15/2009 | | PEND |
Tony Young
|
|
|
|
BLD-Other | 7/9/2009 | 7/9/2009 | 7/9/2009 | P | PART |
Bob Archibald
|
|
|
Reviewed site, finish work in progress (Slow)
|
BLD-Other | 2/5/2009 | 2/5/2009 | 2/5/2009 | A | PART |
Bob Archibald
|
|
|
Slow progress. Finish work going on. Further discussion of purchasing adjavent building.
|
BLD-Conference | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PART |
Bob Archibald
|
|
|
Conference with owner and contractor on requirements for final. Provided occupancy request card for signatures.
|
BLD-Aging Inspection | 11/10/2008 | 11/10/2008 | 11/14/2008 | | DEFR |
Tony Young
|
|
|
325 is taking care of this
|
BLD-Conference | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | PART |
Bob Archibald
|
|
|
Site conference with mechanical inspector and job super on duct openings and rated construction. No openings/penetrations allowed in stair enclosure from basement to first floor.
|
BLD-Other | 7/16/2008 | 7/16/2008 | 7/16/2008 | A | PART |
Bob Archibald
|
|
|
Review of basement and main floor. still have outstanding issues on mechanical systems and exterior windows (COA). Also discussed fire alarm progress and relocation of sprinkler lines. Fire blocking and south soffit made ok sheetrock installation in progress.
|
BLD-Framing/Rough-in | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PART |
Bob Archibald
|
|
|
CN issued for cover of basement and main floor, reinspection required prior to complete cover.
|
BLD-Other | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PASS |
Bob Archibald
|
|
|
Exterior patio stairs to upper level made ok rise/run.
|
BLD-Other | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PART |
Bob Archibald
|
|
|
Work in progress (slow) noncomplying stairway to upper patio has been removed. Electrical contractor on site performing work in basement mechanical room, service drop on north end has been run underground and violtions corrected so that Idaho Power can contect new service drop to building.Plans for 2nd floor are still under review (pending fire and structural).
|
BLD-Conference | 4/23/2008 | 4/23/2008 | 4/23/2008 | A | PART |
Bob Archibald
|
|
|
Phone conference with Noah on elevator shaft requirements. State regulates car and mechanics.
|
BLD-Other | 4/1/2008 | 4/1/2008 | 4/1/2008 | P | PART |
Bob Archibald
|
|
|
Elevator shaft framing approved for cover.
|
BLD-Other | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | FAIL |
Bob Archibald
|
|
|
CN issued on outstanding issues. Reviewed site with Noha phone conference with Bill.
|
BLD-Aging Inspection | 2/18/2008 | 2/18/2008 | 2/21/2008 | | DEFR |
Tony Young
|
|
|
325 is taking care of this
|
BLD-Other | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | PART |
Bob Archibald
|
|
|
Review of elervator shaft construction and overall status of construction. 1st story shaft construction in progress. 1 carpenter on site, no new progress elsewhere.
|
BLD-Other | 12/5/2007 | 12/5/2007 | 12/5/2007 | A | FAIL |
Bob Archibald
|
|
|
CN issued for south soffit, 1 hour construction not verified before covering. Inspection opening requested.
|
BLD-Conference | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | PART |
Bob Archibald
|
|
|
Conference with architect on revised plan requirements.
|
BLD-Other | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PART |
Bob Archibald
|
|
|
Welding inspection report from G3 all welding in compliance to date. Exterior railing welding to be completed.
|
BLD-Other | 11/13/2007 | 11/13/2007 | 11/13/2007 | A | FAIL |
Bob Archibald
|
|
|
Phone conference with Noah on stair run requirements 11" minimum required, 10" not allowed on exterior stairs to patio. Correction Required.
|
BLD-Conference | 11/1/2007 | 11/1/2007 | 11/1/2007 | A | FAIL |
Bob Archibald
|
|
|
CN issued requesting revised plans be submitted to plan review on as builts and DR approvals to date. No framing cover will be allowed until submitted and approved.
|
BLD-Aging Inspection | 10/22/2007 | 10/22/2007 | 10/29/2007 | | PEND |
Tony Young
|
|
|
325 taking care of
|
BLD-Other | 5/24/2007 | 5/24/2007 | 5/24/2007 | A | PART |
Bob Archibald
|
|
|
Resubmittals approved and plans are ready to be picked up.
|
BLD-Concrete | 4/20/2007 | 4/20/2007 | 4/20/2007 | P | PART |
Bob Archibald
|
|
|
Parapet wall on north patio also reviewed furr out framing in basement.
|
BLD-Other | 3/29/2007 | 3/29/2007 | 3/29/2007 | P | PART |
Bob Archibald
|
|
|
Conference on riser heights, headroom clearance in main building and resubmittals
|
BLD-Concrete | 3/23/2007 | 3/23/2007 | 3/23/2007 | A | PART |
Bob Archibald
|
|
|
Interior concrete stairs/landing (Headroom Clearance to be addressed). Exterior patio wall, special inspection performed
|
BLD-Foundation | 3/12/2007 | 3/12/2007 | 3/12/2007 | P | PART |
Bob Archibald
|
|
|
Last section of north wall. special inspection and engineering review had been performed. Remined Bill that plan review still waiting on resubmittals.
|
BLD-Other | 2/14/2007 | 2/14/2007 | 2/14/2007 | A | PART |
Bob Archibald
|
|
|
Site review, conference with contractor on roof/soffit, 2nd story windows on south end, stairs etc..
|
BLD-Other | 2/7/2007 | 2/7/2007 | 2/7/2007 | P | PART |
Bob Archibald
|
|
|
Site review.
|
BLD-Wall cover | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | PART |
Bob Archibald
|
|
|
Exterior shear walls, CN issued.
|
BLD-Conference | 11/15/2006 | 11/15/2006 | 11/15/2006 | P | PART |
Bob Archibald
|
|
|
Met with architect and discussed requirements for resubmittals for all trades/aspects of structure, new structural, architectual, electrical, plumbing and mechanical drawings required. Framing crew has been hired and framing is progressing quickly on exterior of structure.
|
BLD-Concrete | 11/8/2006 | 11/8/2006 | 11/8/2006 | P | PART |
Bob Archibald
|
|
|
Remainder of 2nd floor concrete slab placed today. Requested revised details reflecting changes and Historic approvals.
|
BLD-Conference | 10/18/2006 | 10/18/2006 | 10/18/2006 | P | PART |
Bob Archibald
|
|
|
Discussion on schedule and current status. Reinforcing steel being placed for secound floor concrete placement.
|
BLD-Other | 10/4/2006 | 10/4/2006 | 10/4/2006 | P | PART |
Bob Archibald
|
|
|
Ground level floor slab placed last week special inspection and engineer reviewed prior to concrete placement. 5/8ths type X gypsum applied to exterior south wall and OSB placed on exterior, shear nailing has not been completed(1st floor level only).
|
BLD-Other | 9/22/2006 | 9/22/2006 | 9/22/2006 | P | PART |
Bob Archibald
|
|
|
Site conference with Bill Strack and Larry Sundell on required resubmittals reflecting changes approved by historic commision and as builts, also discussed stair requirements, rise/run. Phone conference with engineer on south wall requirements to meet shear and fire rating. OSB will be removed gyp rock installed and OSB applied over gyp and nailed at 4" oc.. 1st floor slab to scheduled to be placed 9/25/06.
|
BLD-Other | 9/6/2006 | 9/6/2006 | 9/6/2006 | A | PART |
Bob Archibald
|
|
|
COnference with engineer of record and Bill Strack on concrete slabs, shear walls and misc. details. Basement floor slab was placed 9/01/06 except northeast corner, exterior wall framing scheduled to commence with 1st and 2nd floor concrete placement in concurance. Special inspection required on all concrete, reinforcing steel and site welding.
|
BLD-Foundation | 7/12/2006 | 7/12/2006 | 7/12/2006 | P | PART |
Bob Archibald
|
|
|
Concrete placement on remaining north foundation wall placed, special inspector on site. Perimeter footing/foundation now complete.
|
Code Occupancy Approval | 6/30/2006 | 6/30/2006 | 7/3/2006 | P | CANC |
Wm. Michael Meloy
|
|
|
|
BLD-Conference | 6/6/2006 | 6/6/2006 | 6/6/2006 | A | PART |
Bob Archibald
|
|
|
Slow progress, only one worker on site. North foundation wall framing nearly complete and concrete placement scheduled for the near future. Additional structural steel framing has been placed and 1st floor pan deck installation near completion.
|
BLD-Footing | 4/6/2006 | 4/6/2006 | 4/6/2006 | A | PASS |
Bob Archibald
|
|
|
Remaining north wall footing placed 3/31/06, special inspection was provided. Foundation wall reinforcing being placed at this time.
|
BLD-Other | 3/24/2006 | 3/24/2006 | 3/24/2006 | P | PART |
Bob Archibald
|
|
|
Construction of footing formwork for north wall in progress.
|
BLD-Other | 3/3/2006 | 3/3/2006 | 3/8/2006 | P | PART |
Bob Archibald
|
|
|
Metal pan deck being placed for floors, Foundation walls have been backfilled against (west, south and part of east). Excavation in progress for north foundation wall.
|
BLD-Conference | 2/10/2006 | 2/10/2006 | 2/10/2006 | P | PART |
Bob Archibald
|
|
|
Issued CN requesting resubmittals (structural and architectual). Also required separate application ands permit for patio on north end of structure.
|
BLD-Foundation | 2/1/2006 | 2/1/2006 | 2/1/2006 | A | PART |
Bob Archibald
|
|
|
Remainder of south wall and east wall placed, both engineer and special inspection had reviewed. This concrete placement completes 3/4 of footing and foundation with only the north wall remaining to be placed.
|
BLD-Footing | 1/23/2006 | 1/23/2006 | 1/23/2006 | P | PART |
Bob Archibald
|
|
|
Remainder of south wall and south 1/2 of east wall formed and ready for concrete placement. When placed this will complete 2/3rds of footing and foundation. Work in progress on northeast corner to plumb structural steel.
|
BLD-Footing | 12/2/2005 | 12/2/2005 | 12/2/2005 | A | PART |
Bob Archibald
|
|
|
Remainder of 13th street, northwest corner, footing has been placed and special inspection was provided. Excavation and formwork placement for footing in progress on southeast corner of project.
|
BLD-Concrete | 11/18/2005 | 11/18/2005 | 11/18/2005 | P | PART |
Bob Archibald
|
|
|
1st floor pan deck being installed, footing being formed at northwest corner.
|
BLD-Concrete | 11/10/2005 | 11/10/2005 | 11/10/2005 | P | PART |
Bob Archibald
|
|
|
Basement slab placement in progress, observed special inspection report and witnessed concrete testing.
|
BLD-Foundation | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | PART |
Bob Archibald
|
|
|
Met with structural engineer and reviewed foundation wall reinforcement on southwest corner of building, concrete placement scheduled for 11/03/05. Requested a entire stamped engineering package when concrete work was completed as design requirements had changed. Craig said he would provide.
|
BLD-Foundation | 10/28/2005 | 10/28/2005 | 10/28/2005 | P | PART |
Bob Archibald
|
|
|
Foundation reinforcement and forms in place, special inspection has been performed and passed (1/2 of south wall and 1/2 of 13th street wall). Also received special inspection reports on welding, concrete breaks and reinforcing inspection
|
BLD-Footing | 10/11/2005 | 10/11/2005 | 10/11/2005 | P | PART |
Bob Archibald
|
|
|
Reinforcing steel being placed in south west corner of structure ~ half the length of 13th street and have the length of south wall. Special inspection has been requested/scheduled by permit holder.
|
BLD-Footing | 9/28/2005 | 9/28/2005 | 9/28/2005 | P | PASS |
Bob Archibald
|
|
|
Special inspection has been performed on the 4 main interior column footing pads. Special inspection reported reinforcing steel exceeded approved plans. Concrete placement scheduled for 9/29/05.
|
BLD-Other | 9/27/2005 | 9/27/2005 | 9/27/2005 | P | PASS |
Bob Archibald
|
|
|
Historic Preservation Commission approved DRH05-00290 for the construction of a second story patio and brick support wall on the north end of this structure. Resubmittals must be provided to plan review for code anaysis.
|
BLD-Conference | 9/23/2005 | 9/23/2005 | 9/23/2005 | P | |
Bob Archibald
|
|
|
Excavation and formwork in progress for the 4 center column footings. Concret placement scheduled for 9/27/05.
|
BLD-Other | 9/16/2005 | 9/16/2005 | 9/16/2005 | P | PART |
Bob Archibald
|
|
|
Excavation near completion. Reported that pit run would be delivered later for footing base.
|
BLD-Other | 9/9/2005 | 9/9/2005 | 9/9/2005 | P | PART |
Bob Archibald
|
|
|
Cable bracing installed for stability of structural frame. No new excavation in progress or placement of formwork for footings.
|
BLD-Conference | 9/1/2005 | 9/1/2005 | 9/1/2005 | P | PART |
Bob Archibald
|
|
|
Site conference with Bill, informed him that schedule must be increased as project is behind schedule. Excavation of basement in progress and Bill informed me that 13th street side foundation will be placed 1st and frame should be on foundation by 15th with remainder to follow shortly after.
|
BLD-Other | 8/26/2005 | 8/26/2005 | 8/26/2005 | P | PART |
Bob Archibald
|
|
|
Excavation of basement in progress, slow.Steel frame outfitted with jacks and has been slightly raised to finished floor elevation.
|
BLD-Conference | 8/1/2005 | 8/1/2005 | 8/1/2005 | P | PART |
Bob Archibald
|
|
|
Met with super, architect and engineer on site to resolve skylight issue. Engineer provided design for structural framing.
|
BLD-Other | 7/28/2005 | 7/28/2005 | 7/28/2005 | P | PART |
Bob Archibald
|
|
|
Site visit. Single story portion of structure on south end has been demo'd and removed, excavation for basement in progress. Structural steel of 2 story near completion.
|
BLD-Other | 7/20/2005 | 7/20/2005 | 7/20/2005 | A | PART |
Bob Archibald
|
|
|
Issued CN on south basement walls listing requirements for window installation. Structural steel roofing near completion.
|
BLD-Other | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | PART |
Bob Archibald
|
|
|
Site review of construction progress to date. Conference with Bill Strack. Structural steel installation near complete in two story roof area, demolition of exterior patio area and removal of roof covering on south single story area in progress. Requested wall stabalization in patio area , northwest corner, diagonal bracing and bearing.
|
BLD-Other | 6/29/2005 | 6/29/2005 | 6/29/2005 | P | PART |
Bob Archibald
|
|
|
Reinforcing of roof still in progress.
|
BLD-Other | 6/23/2005 | 6/23/2005 | 6/23/2005 | P | PART |
Bob Archibald
|
|
|
Site visit. Reinforcing of roof in progress, new framing members being installed along-side existing members. Phone conference with Bill informed him all resubmittals must have signature on wet stamp( architect/engineer).
|
BLD-Conference | 6/17/2005 | 6/17/2005 | 6/17/2005 | A | PART |
Bob Archibald
|
|
|
Conference on below grade windows on southside of structure. Spoke with Mike P. and Jeff N., below grade windows would be allowed on south side provided windows are entirely below finished grade and provided with a protective screening over window well. Window well must remain entirely on property and not cross adjacent property line.Windows would not be a required means of egress. Explained these conditions to Bill S. and requested a resubmittal if windows are to be installed.
|
BLD-Other | 6/17/2005 | 6/17/2005 | 6/17/2005 | A | PART |
Bob Archibald
|
|
|
Notes for activities prior to issuance of this permit are contained in permit # MIS05-00013.
|