BLD-Final | 12/7/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Dave Hannah
|
|
|
gil Phone #: ###-#### ste 201 bld 2
|
FIRE-Final Inspection | 12/6/2016 | 12/7/2016 | 12/7/2016 | A | PASS |
Troy Cobbley
|
|
|
bldg 2 suite 201 life safety passed
|
BLD-Final | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-#### bldg 3, ste 401
|
BLD-Final | 11/2/2016 | 11/3/2016 | 11/3/2016 | P | NR |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
FIRE-Final Inspection | 11/2/2016 | 11/3/2016 | 11/3/2016 | A | PART |
Troy Cobbley
|
|
|
BUILDING #3 – Suite #401 Life safety passed
|
BLD-Aging Inspection | 10/26/2016 | 10/26/2016 | 11/3/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 101-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 305-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 304-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 301-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 207-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 206-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 204-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 203-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 202-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 103-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 3 unit 102-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 403-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 401-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 305-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 301-ok for final C of O Phone #: ###-####
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 104-ok for final C of O
|
BLD-Final | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Sly
|
|
|
final on bldg 2 unit 103-ok for final C of O
|
BLD-Final | 7/12/2016 | 7/13/2016 | 7/13/2016 | P | PEND |
Dave Hannah
|
|
|
Dave unit #2-101 Phone #: ###-#### ok for temp occ ok for perm after bldg gos perm
|
FIRE-Final Inspection | 7/12/2016 | 7/13/2016 | 7/13/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 6/17/2016 | 8/15/2012 | 6/17/2016 | A | PASS |
Tom Arcoraci
|
|
|
****notes from 8/15/12 inspection request***-call first -- units 207, 206, 203 -- Gill Phone #: ###-#### those units in bld 3 ok for occupancy-6/17/16 as per Bob A. ok to issue C of O's for Bldg 3-units 207, 206 & 203
|
BLD-Aging Inspection | 5/19/2016 | 5/19/2016 | 5/26/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 3/10/2016 | 3/11/2016 | 3/11/2016 | P | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### Bldg 3 ....unit 205 OK to occupy.
|
FIRE-Final Inspection | 3/10/2016 | 3/11/2016 | 3/11/2016 | A | PART |
Troy Cobbley
|
|
|
life safety for Building #3, Unit 205 passed
|
BLD-Aging Inspection | 1/22/2016 | 1/22/2016 | 1/27/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 11/3/2015 | 11/4/2015 | 11/4/2015 | A | PASS |
Jim Storey
|
|
|
Apartment 3-303 - Dave Phone #: ###-####
|
FIRE-Final Inspection | 11/3/2015 | 11/3/2015 | 11/3/2015 | P | PART |
Troy Cobbley
|
|
|
Apartment 3-303 - Life safety passed
|
BLD-Aging Inspection | 9/23/2015 | 9/23/2015 | 9/29/2015 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/24/2015 | 7/28/2015 | 7/28/2015 | P | PASS |
Jim Sly
|
|
|
Dave-bldg 2-102 Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 7/24/2015 | 7/28/2015 | 7/28/2015 | A | PASS |
Jim Page
|
|
|
Bldg 2-102 Life fire safety passed/complete
|
BLD-Aging Inspection | 6/17/2015 | 6/17/2015 | 6/23/2015 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 4/6/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Dave Hannah
|
|
|
Building 3 403// Dave Phone #: ###-####
|
FIRE-Final Inspection | 4/6/2015 | 4/7/2015 | 4/7/2015 | A | PASS |
Scott Arellano
|
|
|
Approved.
|
BLD-Aging Inspection | 2/25/2015 | 2/25/2015 | 2/27/2015 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/15/2014 | 12/15/2014 | 12/22/2014 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 10/15/2014 | 10/16/2014 | 10/16/2014 | A | PASS |
Dave Hannah
|
|
|
Dave-Bldg 2 unit 304 Phone #: ###-####
|
FIRE-Final Inspection | 10/13/2014 | 10/13/2014 | 10/13/2014 | P | PASS |
Craig D. Hanson
|
|
|
Bldg 2, unit 305 // Dave Phone #: ###-####
|
FIRE-Final Inspection | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PART |
Forrest France
|
|
|
Unit 205 building #2 passed fire life safety final inspection.
|
BLD-Final | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PASS |
Dave Hannah
|
|
|
Gil-please call 20 mintues prior Unit #2-205 Phone #: ###-####
|
BLD-Final | 8/8/2014 | 8/11/2014 | 8/11/2014 | P | PASS |
Dave Hannah
|
|
|
call before // for units 2-402 & 2-20 ... 4Gill Phone #: ###-####
|
FIRE-Final Inspection | 8/8/2014 | 8/11/2014 | 8/11/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection for units 204 and 402 building #2 passed inspection.
|
BLD-Final | 7/9/2014 | 7/11/2014 | 7/11/2014 | A | PASS |
Jim Storey
|
|
|
Gil Phone #: ###-#### final ok for unit 2-207
|
FIRE-Final Inspection | 7/9/2014 | 7/10/2014 | 7/10/2014 | A | PART |
Forrest France
|
|
|
Fire life safety inspection passed for unit 207 building #2.
|
FIRE-Final Inspection | 5/2/2014 | 5/2/2014 | 5/2/2014 | P | PART |
Forrest France
|
|
|
Building #2 unit 303 and building #3 unit 404 passed fire life safety inspection.
|
BLD-Final | 5/2/2014 | 5/2/2014 | 5/2/2014 | P | PASS |
Tom Arcoraci
|
|
|
gale - please call 20 minutes prior - bldt2-303 and bld 3-404 Phone #: ###-#### ok for occ
|
BLD-Final | 3/28/2014 | 3/31/2014 | 3/31/2014 | P | PASS |
Tom Arcoraci
|
|
|
bld2-202Gill Phone #: ###-#### ok for occ
|
FIRE-Final Inspection | 3/28/2014 | 3/31/2014 | 3/31/2014 | A | PART |
Forrest France
|
|
|
Fire life safety for building #2 unit 202 passed inspection.
|
FIRE-Final Inspection | 3/12/2014 | 3/13/2014 | 3/13/2014 | A | PART |
Forrest France
|
|
|
Building 2 unit 403 passed fire life safety inspection.
|
FIRE-Final Inspection | 3/12/2014 | 3/13/2014 | 3/13/2014 | A | PART |
Forrest France
|
|
|
Building 3 unit 305 passed fire life safety inspection.
|
BLD-Final | 3/12/2014 | 3/13/2014 | 3/13/2014 | A | PASS |
Tom Arcoraci
|
|
|
call before // (bldg 3- unit 305) //Gale Phone #: ###-#### ok for final
|
BLD-Final | 3/12/2014 | 3/13/2014 | 3/13/2014 | A | PASS |
Tom Arcoraci
|
|
|
call before // (bldg 2- unit 403) //Gale Phone #: ###-#### ok for final
|
BLD-Aging Inspection | 1/20/2014 | 1/20/2014 | 1/21/2014 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/18/2013 | 11/18/2013 | 11/18/2013 | | PEND |
Tom Arcoraci
|
|
|
wip
|
FIRE-Final Inspection | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | PART |
Forrest France
|
|
|
Building #2 unit #405 passed fire life safety inspection.
|
BLD-Final | 9/18/2013 | 9/19/2013 | 9/19/2013 | A | PASS |
Tom Arcoraci
|
|
|
2405 gil please call 30 min before going out Phone #: ###-#### bld 2 unit 405 ok for temp
|
BLD-Final | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | PASS |
Tom Arcoraci
|
|
|
gail - 3-304 Phone #: ###-#### bld 3 unit 304 ok
|
FIRE-Final Inspection | 8/22/2013 | 8/23/2013 | 8/23/2013 | A | PART |
Forrest France
|
|
|
Fire life safety inspection completed for unit 304 building #3. Contractor to relocate surface mounted light fixture in the utility room as discussed.
|
FIRE-Final Inspection | 8/19/2013 | 8/19/2013 | 8/19/2013 | P | PART |
Forrest France
|
|
|
Fire life safety inspection for unit # 305 building #2 completed acceptable.
|
BLD-Final | 8/19/2013 | 8/19/2013 | 8/19/2013 | P | PASS |
Tom Arcoraci
|
|
|
gail Phone #: ###-#### building 2 unit 305 ok for occ
|
BLD-Aging Inspection | 8/14/2013 | 8/14/2013 | 8/14/2013 | | PEND |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 6/14/2013 | 6/17/2013 | 6/17/2013 | A | PART |
Forrest France
|
|
|
Building #2 unit 302 passed fire life safety inspection.
|
BLD-Final | 6/14/2013 | 6/17/2013 | 6/17/2013 | A | PEND |
Tony Young
|
|
|
call 20 min before to meet//bldg 2-302 //Gill Phone #: ###-####,, ok pending others
|
BLD-Final | 5/23/2013 | 5/24/2013 | 5/24/2013 | A | PASS |
Tom Arcoraci
|
|
|
GIL please call before going out Phone #: ###-#### bld 2 unit 206 ok for occ
|
FIRE-Final Inspection | 5/23/2013 | 5/23/2013 | 5/23/2013 | P | PART |
Forrest France
|
|
|
Building 2 unit 206 passed fire life safety inspection.
|
BLD-Final | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PART |
Tom Arcoraci
|
|
|
Please call ahead - Unit 2-103 - Gil Phone #: ###-#### bld 2 unit 103 ok
|
BLD-Final | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PART |
Tom Arcoraci
|
|
|
Please call ahead - Unit 3-301 - Gil Phone #: ###-#### bld 3 unit 301 ok
|
FIRE-Final Inspection | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PART |
Forrest France
|
|
|
Please call ahead - Unit 3-301 - Gil Phone #: ###-#### * Unit 301 fire life safety okayed
|
FIRE-Final Inspection | 5/15/2013 | 5/16/2013 | 5/16/2013 | A | PART |
Forrest France
|
|
|
Please call ahead - Unit 2-103 - Gil Phone #: ###-#### * Unit 103 fire life safety inspection passed
|
BLD-Final | 4/11/2013 | 4/12/2013 | 4/12/2013 | A | PASS |
Tom Arcoraci
|
|
|
gil - call 30 mins prior to meet Phone #: ###-#### bld 2 units 301 and 401 ok for occ
|
FIRE-Final Inspection | 4/11/2013 | 4/11/2013 | 4/12/2013 | P | PART |
Forrest France
|
|
|
Building #2 units 301 and 401 fire life safety okay pending removal of travel cap and ceiling repair at 301 mech closet, provide intermediate temp. head at one bedroom and install missing escutcheon.
|
FIRE-Final Inspection | 2/20/2013 | 2/21/2013 | 2/21/2013 | A | PART |
Forrest France
|
|
|
Building #2 suite 104 passed final fire life safety inspection.
|
BLD-Final | 2/20/2013 | 2/21/2013 | 2/21/2013 | A | PASS |
Tom Arcoraci
|
|
|
call before//suite 2-104 only//Gil Phone #: ###-#### bld 2 104 ok tma
|
BLD-Final | 1/3/2013 | 1/4/2013 | 1/4/2013 | A | PASS |
Tom Arcoraci
|
|
|
Blg 2 unit 203 - gil Phone #: ###-#### ok
|
FIRE-Final Inspection | 1/3/2013 | 1/4/2013 | 1/4/2013 | A | PART |
Troy Cobbley
|
|
|
Blg 2 unit 203 life safety passed.
|
BLD-Final | 12/17/2012 | 12/18/2012 | 12/18/2012 | A | CANC |
Tom Arcoraci
|
|
|
Blg 3 unit 204 - Rich Phone #: ###-####
|
FIRE-Final Inspection | 12/6/2012 | 12/6/2012 | 12/7/2012 | A | PART |
Forrest France
|
|
|
Unit 204 building 3 life safety inspection completed. Fire alarm permit to include added horn at the extra bedroom pending.
|
BLD-Final | 12/3/2012 | 12/4/2012 | 12/4/2012 | A | CANC |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 12/3/2012 | 12/3/2012 | 12/3/2012 | P | FAIL |
Forrest France
|
|
|
Inspection for building 3 unit 204 failed due to overdue certifications on fire extinguishers at the common corrdior. Also need to test the new audible notification appliance at the second bedroom.
|
Extend Permit 90/180 days | 12/3/2012 | 12/3/2012 | 12/3/2012 | P | PART |
Tom Arcoraci
|
|
|
unit 204 bld 3 ok for temp occ after fire signs off
|
BLD-Final | 11/30/2012 | 12/3/2012 | 12/3/2012 | A | NR |
Tom Arcoraci
|
|
|
Bld 2 unit 204 - Rich Phone #: ###-#### needs fire insp
|
FIRE-Final Inspection | 11/13/2012 | 11/14/2012 | 11/14/2012 | A | PART |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory for building #3 unit 104.
|
BLD-Final | 11/13/2012 | 11/14/2012 | 11/14/2012 | P | PASS |
Tom Arcoraci
|
|
|
Call for access - Gayle Phone #: ###-#### building 3 unit 104 ok for temp occ
|
BLD-Final | 11/1/2012 | 11/2/2012 | 11/2/2012 | P | CANC |
Tom Arcoraci
|
|
|
Gill-Building #2 #402 Building #3 201, #302, #402 Please call prior to inspection Phone #: ###-####
|
FIRE-Final Inspection | 11/1/2012 | 11/2/2012 | 11/2/2012 | A | PASS |
Forrest France
|
|
|
Building #2 unit 404, building #3 units 201,302, and 402 completed fire life safety inspections. Occupant notification must meet min. dB per NFPA 72.
|
BLD-Final | 11/2/2012 | 11/2/2012 | 11/2/2012 | A | PASS |
Tom Arcoraci
|
|
|
Gill-Building #2 #402 Building #3 201, #302, #402 Please call prior to inspection Phone #: ###-#### ok for occ
|
Extend Permit 90/180 days | 11/2/2012 | 11/2/2012 | 11/2/2012 | P | CANC |
Tom Arcoraci
|
|
|
Gill-Building #2 #402 Building #3 201, #302, #402 Please call prior to inspection Phone #: ###-####
|
BLD-Final | 10/31/2012 | 11/1/2012 | 11/1/2012 | A | NR |
Tom Arcoraci
|
|
|
PLease call prior to inspection--Gill-Building #2 #402, Building #3 #201, #302, #402 Phone #: ###-####
|
BLD-Aging Inspection | 10/15/2012 | 10/15/2012 | 10/15/2012 | | PEND |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 8/14/2012 | 8/15/2012 | 8/15/2012 | A | PART |
Forrest France
|
|
|
Fire life safety inspection at units 203, 206 and 207 passed.
|
BLD-Final | 8/14/2012 | 8/15/2012 | 8/15/2012 | P | CANC |
Tom Arcoraci
|
|
|
call first -- units 207, 206, 203 -- Gill Phone #: ###-#### those units in bld 3 ok for occupancy
|
BLD-Final | 7/10/2012 | 7/10/2012 | 7/10/2012 | A | PART |
Tom Arcoraci
|
|
|
bld 3 unit 202 ok for occupanvy
|
BLD-Aging Inspection | 7/4/2012 | 7/4/2012 | 7/5/2012 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/23/2012 | 4/23/2012 | 4/23/2012 | | PEND |
Tom Arcoraci
|
|
|
|
BLD-Other | 2/22/2012 | 2/22/2012 | 2/22/2012 | P | PEND |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 2/22/2012 | 2/22/2012 | 2/22/2012 | | PEND |
Tom Arcoraci
|
|
|
on temp
|
BLD-Final | 12/22/2011 | 12/23/2011 | 12/23/2011 | P | PART |
Tom Arcoraci
|
|
|
ok for temp occ
|
FIRE-Final Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | A | PASS |
Forrest France
|
|
|
Inspection passed. Fire life safety finaled.
|
FIRE-Final Inspection | 12/22/2011 | 12/22/2011 | 12/23/2011 | P | PART |
Forrest France
|
|
|
|
BLD-Conference | 12/22/2011 | 12/22/2011 | 12/22/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/21/2011 | 12/21/2011 | 12/22/2011 | P | PART |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 12/20/2011 | 12/21/2011 | 12/22/2011 | P | PART |
Forrest France
|
|
|
Verified additional emergency lighting at the parking garage levels for buildings 2 and 3.
|
BLD-Conference | 12/19/2011 | 12/21/2011 | 12/21/2011 | A | PART |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 12/19/2011 | 12/21/2011 | 12/20/2011 | A | CANC |
Forrest France
|
|
|
Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
|
FIRE-Final Inspection | 12/19/2011 | 12/20/2011 | 12/20/2011 | P | PART |
Forrest France
|
|
|
Exit discharge lighting retested okay, completed testing at buildings 2 and 3 unit smoke alarms for location and interconnection- noted areas where SA need relocated per NFPA 72, 4th floor fire sprinkler work verified.
|
FIRE-Final Inspection | 12/17/2011 | 12/19/2011 | 12/19/2011 | A | PART |
Forrest France
|
|
|
Completed walkthrough of EM lighting and exit signage for functionality on emergency power. Noted exit discharge lighting at some locations is not operable. Discussed items on fire code review notes, schedule for final approvals.
|
BLD-Conference | 12/16/2011 | 12/19/2011 | 12/19/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/16/2011 | 12/16/2011 | 12/16/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 12/15/2011 | 12/15/2011 | 12/15/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 10/26/2011 | 10/27/2011 | 10/27/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/18/2011 | 10/26/2011 | 10/26/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/4/2011 | 10/18/2011 | 10/18/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 9/26/2011 | 10/4/2011 | 10/4/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Conference | 10/3/2011 | 10/4/2011 | 10/4/2011 | A | DONE |
Forrest France
|
|
|
Leonard would like to discuss fire lanes and signage. Please call when you are available. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Other | 9/27/2011 | 9/27/2011 | 9/27/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 9/26/2011 | 9/26/2011 | 9/26/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 9/23/2011 | 9/23/2011 | 9/26/2011 | P | PASS |
Tom Arcoraci
|
|
|
Grid ceilings are ready to look at. Call me. >> Inspection requested via web by Bob Thornton
|
BLD-Conference | 8/11/2011 | 8/19/2011 | 8/19/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 8/11/2011 | 8/17/2011 | 8/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 8/9/2011 | 8/17/2011 | 8/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 8/11/2011 | 8/15/2011 | 8/15/2011 | A | PART |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 8/11/2011 | 8/11/2011 | 8/11/2011 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 8/3/2011 | 8/10/2011 | 8/9/2011 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 7/27/2011 | 8/3/2011 | 8/3/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/19/2011 | 7/27/2011 | 7/27/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 7/25/2011 | 7/26/2011 | 7/26/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/25/2011 | 7/25/2011 | 7/25/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/12/2011 | 7/19/2011 | 7/19/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/12/2011 | 7/12/2011 | 7/12/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/8/2011 | 7/12/2011 | 7/12/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 7/6/2011 | 7/8/2011 | 7/8/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/6/2011 | 7/6/2011 | 7/6/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/27/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/1/2011 | 7/1/2011 | 7/5/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/23/2011 | 6/27/2011 | 6/27/2011 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Other | 6/21/2011 | 6/23/2011 | 6/23/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/17/2011 | 6/21/2011 | 6/21/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 6/14/2011 | 6/17/2011 | 6/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
wip ok to cover
|
BLD-Energy code compliance | 6/13/2011 | 6/14/2011 | 6/14/2011 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Energy code compliance | 6/10/2011 | 6/10/2011 | 6/10/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 6/8/2011 | 6/8/2011 | 6/8/2011 | P | PASS |
Tom Arcoraci
|
|
|
2nd floor wip ok
|
BLD-Energy code compliance | 6/8/2011 | 6/8/2011 | 6/8/2011 | P | PASS |
Tom Arcoraci
|
|
|
2nd floor wip ok
|
BLD-Wall cover | 6/3/2011 | 6/6/2011 | 6/6/2011 | A | PASS |
Tom Arcoraci
|
|
|
bld 2 4 units
|
BLD-Energy code compliance | 6/2/2011 | 6/3/2011 | 6/3/2011 | A | PASS |
Tom Arcoraci
|
|
|
Per Bob Thornton from CRB LLC this inspection has nothing to do with the plan modification that was turned in on 6-1-11 This inspection is for building 2 level 3
|
BLD-Energy code compliance | 5/23/2011 | 5/24/2011 | 5/24/2011 | A | PASS |
Tom Arcoraci
|
|
|
Bldg 2 level 3 unit 2/301 and 2/302. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Framing/Rough-in | 5/20/2011 | 5/23/2011 | 5/23/2011 | A | PASS |
Tom Arcoraci
|
|
|
Inspect 2/301 and 2/302. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Energy code compliance | 5/18/2011 | 5/18/2011 | 5/18/2011 | P | PASS |
Tom Arcoraci
|
|
|
Bldg 2 level 4 units 2/401 and 2/402 Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 5/16/2011 | 5/17/2011 | 5/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
Bldg 2 units 2/401 and 2/402 Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Energy code compliance | 5/13/2011 | 5/16/2011 | 5/16/2011 | P | PASS |
Tom Arcoraci
|
|
|
Inspect bldg 2 units 403 404 and 405. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
FIRE-Conference | 5/10/2011 | 5/12/2011 | 5/12/2011 | P | DONE |
Forrest France
|
|
|
On site conference with contractor and structural inspector regarding exiting at the pool enclosure.
|
BLD-Wall cover | 5/11/2011 | 5/12/2011 | 5/12/2011 | P | PASS |
Tom Arcoraci
|
|
|
Partial framing inspection bldg 2 level 4. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Conference | 5/10/2011 | 5/12/2011 | 5/12/2011 | P | PASS |
Tom Arcoraci
|
|
|
I would like to meet with you and Forest to discuss pool egress. Is it possible to get you both here at the same time? Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Wall cover | 5/11/2011 | 5/12/2011 | 5/12/2011 | A | PASS |
Tom Arcoraci
|
|
|
Look at bldg 3 corridors 2nd 3rd and 4th floors. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Conference | 5/10/2011 | 5/11/2011 | 5/10/2011 | P | CANC |
Tom Arcoraci
|
|
|
We want to meet with you and the fire inspector at the same time to discuss egress from the pool area. Is that possible? Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
|
BLD-Framing/Rough-in | 5/6/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Tom Arcoraci
|
|
|
Inspect Bldg 3 level 4 unit F Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Conference | 5/5/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 4/4/2011 | 4/4/2011 | 4/4/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 3/2/2011 | 3/3/2011 | 3/3/2011 | A | PASS |
Tom Arcoraci
|
|
|
Call me or meet there at 9:00 am. Thanks. Phone #: ###-#### >> Inspection requested via web by Bob Thornton
|
BLD-Aging Inspection | 2/28/2011 | 2/28/2011 | 2/28/2011 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/27/2010 | 12/27/2010 | 12/27/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/25/2010 | 10/25/2010 | 10/25/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/23/2010 | 8/23/2010 | 8/23/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 6/23/2010 | 6/23/2010 | 6/23/2010 | P | PART |
Tom Arcoraci
|
|
|
partial fourth floor
|
BLD-Aging Inspection | 5/3/2010 | 5/3/2010 | 5/3/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 3/2/2010 | 3/2/2010 | 3/2/2010 | | PART |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 12/31/2009 | 12/31/2009 | 12/31/2009 | P | PART |
Tom Arcoraci
|
|
|
Tom, please call Bob Thornton. Internet Inspection Request from: Bob Thornton ext walls 4 th floor ok to insul
|
BLD-Conference | 11/20/2009 | 11/20/2009 | 11/20/2009 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
|
BLD-Aging Inspection | 9/25/2009 | 9/25/2009 | 9/25/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/11/2009 | 6/11/2009 | 6/11/2009 | P | PASS |
Tom Arcoraci
|
|
|
Look at the ceiling grid in the 1st floor corridor and lobby of bldg 3. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Aging Inspection | 4/13/2009 | 4/13/2009 | 4/13/2009 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 1/19/2009 | 1/20/2009 | 1/20/2009 | A | PART |
Tom Arcoraci
|
|
|
Bldg 3 lobby soffit framing. Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
|
BLD-Wall cover | 12/31/2008 | 12/31/2008 | 12/31/2008 | P | PASS |
Tom Arcoraci
|
|
|
Inspect the drop ceiling at bldg 3 carport. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 12/10/2008 | 12/11/2008 | 12/11/2008 | A | PART |
Tom Arcoraci
|
|
|
Inspect the bldg 3 lobby for cover. Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
|
BLD-Framing/Rough-in | 11/4/2008 | 11/4/2008 | 11/4/2008 | P | PART |
Tom Arcoraci
|
|
|
Discuss SCR cable Phone #: ###-#### Internet Inspection Request from: Bob Thornton wip ok
|
BLD-Conference | 11/4/2008 | 11/4/2008 | 11/4/2008 | P | DONE |
Jim Sly
|
|
|
Tom, Bring Jim Sly to discuss SCR cable. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Wall cover | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | PASS |
Jim Sly
|
|
|
Inspect the 2nd floor of bldg 3. Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Conference | 10/23/2008 | 10/23/2008 | 10/23/2008 | P | CANC |
Jim Sly
|
|
|
I will have some information on the flame spread and smoke development for the SCR cable. Phone #: ###-#### Internet Inspection Request from: Bob Thornton Canc by Contr...
|
BLD-Conference | 10/21/2008 | 10/22/2008 | 10/22/2008 | A | DONE |
Jim Sly
|
|
|
I''ll be out to a meeting from 10:00 to 1:00. Call me before or after. Phone #: ###-#### Internet Inspection Request from: Bob Thornton Met with Bob ... Gave him copy of Chapter 8 2003 IBC
|
BLD-Energy code compliance | 10/6/2008 | 10/7/2008 | 10/7/2008 | A | PASS |
Jim Sly
|
|
|
Inspect the 3rd floor of bldg 3 Phone #: ###-#### Internet Inspection Request from: Bob Thornton
|
BLD-Energy code compliance | 10/3/2008 | 10/6/2008 | 10/6/2008 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton 3rd and 4th floors
|
BLD-Framing/Rough-in | 10/1/2008 | 10/2/2008 | 10/2/2008 | A | PART |
Jim Sly
|
|
|
Inspect 4th floor, 3rd floor and misc mechanical rooms. Phone #: ###-#### Internet Inspection Request from: Bob Thornton OK to cover....Lounge Ceiling, all Mech Rooms (1 side), 3rd and 4th floors.
|
BLD-Energy code compliance | 9/24/2008 | 9/25/2008 | 9/25/2008 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Thornton 4 units in Bldg #3............. NOTE: All previous inspections were called in by contractor (by mistake) on Permit # BLD 06-02320 which was for Underground parking shell.
|
BLD-Aging Inspection | 7/16/2008 | 7/16/2008 | 7/16/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 5/13/2008 | 5/13/2008 | 5/12/2008 | | NR |
Tom Arcoraci
|
|
|
wip
|