Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD06-02324
StatusFinaled
Name CRESCENT RIM OWNERS ASSOC INC
Site Address 2967 W CRESCENT RIM DR
Project NameCRESCENT RIM #4-CONDOS
Customer Number 
ePlanReviewYes
Description
(CRESCENT RIM RESIDENTIAL CONDOMINIUM BUILDING #4 – THREE STORIES ABOVE EXISTING GARAGE – DRH05-00397 AND CUP04-00107) (9-28-17 PLAN MODIFICATION TO ALLOW THE UNITS UNDER CONTRACT FOR PURCHASE [i.e. 103, 203, and 302] TO BE BOUND BY AN EXECUTED DEED ENCUMBRANCE THAT REQUIRES THE UNIT TO BE RESTORED TO COMPLIANCE WHEN SOLD, IF REQUESTED BY THE PURCHASER. WHERE OPTION “B” IS USED FOR THE BATHROOMS, AT LEAST ONE BATHROOM IS REGULATED FOR ACCESSIBILITY. IN THAT REGULATED BATHROOM, COUNTERS ARE REQUIRED TO BE LOWERED TO 34 INCHES MAXIMUM PER THE ENCUMBRANCE.) (4-6-16 PLAN MODIFICATION.) (3-9-16 PLAN MODIFICATION.) (3-10-16 BEFORE ROUGH INSPECTIONS FOR THE 3 STORY APARTMENT BUILDING ARE APPROVED, A LETTER IS REQUIRED TO BE SUBMITTED FROM THE ENGINEER OF RECORD VALIDATING THAT THE PODIUM HAS NOT EXPERIENCED SIGNIFICANT DEGRADATION OR DAMAGE SINCE IT WAS CONSTRUCTED. IF REPAIRS ARE REQUIRED, COMPLETE DESIGNS AND DRAWINGS ARE REQUIRED TO BE SUBMITTED TO SHOW HOW THE REPAIRS WILL BE DONE. REPAIRS SHALL NOT BE COMMENCED UNTIL THE DRAWINGS FOR THE PROPOSED REPAIRS ARE REVIEWED AND APPROVED. THE 3 STORY APARTMENT BUILDING IS NOT ALLOWED TO BE OCCUPIED UNTIL ALL REPAIRS ARE COMPLETED AND APPROVED. CJW) The NFPA 13-R fire sprinkler system is used for occupancy. This project description replaces all previous descriptions. The work is required to comply with all applicable codes and ordinances in effect on August 14, 2006, the date of permit application. To construct a 3 story, 53,543 square foot residential apartment building (19,822 square feet 1st story, 19,822 square feet 2nd story, and 13,899 square feet 3rd story) on top of an existing 18,661 square foot basement parking garage. The basement was constructed under permit BLD06-02321 (S-2 Occupancy with an occupant load of 93). There will be 19 dwelling units and 1 hotel suite within this building. There will be 2 Type A dwelling units, 17 Type B dwelling units, and 1 accessible hotel suite. The work is to include concrete footings, concrete piers, concrete stem walls, concrete slabs on grade, exterior wood stud bearing walls, interior wood stud bearing walls, wood beams, wood columns, steel beams, steel columns, wood shear walls, wood joist floor systems, wood truss roof systems, wood trellises, synthetic slate roof shingles, mechanically fastened single ply roofing at flat roof areas, roof drains and overflow drains or scuppers at flat roofs, exterior portland cement stucco, exterior manufactured stone veneer, interior 1-hr corridors, interior 2-hr stairway enclosures, a 2-hr elevator shaft, a 1-hr trash chute shaft enclosure with 1-hr trash room, interior doors, exterior doors, exterior windows, gas fireplaces, millwork, and finishes. Special Inspection is required for welding, bolding of steel to steel, wind resistance, seismic resistance, and post installed concrete anchors. Before any holes are drilled through or into the post tensioned concrete deck, the deck is required to be X-rayed, or otherwise scanned (e.g. ground penetrating radar), to precisely determine the location of concrete reinforcement. No concrete reinforcement is allowed to be cut, including post tensioned cables. This requirement applies to holes for anchor bolts, plumbing pipes, electrical conduit, etc. The design for engineered wood trusses is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, with the Structural Engineer’s design, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. An NFPA 13 fire sprinkler system is required for the parking garage. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection3/16/20183/16/20183/16/2018PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final3/16/20183/16/20183/16/2018PPASS
DetailsJim Sly
final for shell/core entire building // Bob ###-####
BLD-Aging Inspection3/5/20183/5/20183/8/2018 PEND
DetailsDave Hannah
BLD-Final1/2/20181/3/20181/3/2018APART
DetailsJim Sly
Final units 201, 202, 207, 208, 301 and 304 Phone #: ###-#### Inspection requested via web by Bob Thornton
OK FOR TEMP occ. on above units. OK for Perm Occ. when Bldg shell is signed off for Perm. Occ.
BLD-Final12/12/201712/13/201712/13/2017APART
DetailsJim Sly
Final units 102 and 107 Phone #: ###-#### Inspection requested via web by Bob Thornton
Units 102 and 107 OK for Temp. Occ. OK for Perm Occ. when shell building is finaled off.
FIRE-Final Inspection12/12/201712/12/201712/12/2017PPART
DetailsTroy Cobbley
Life safety in Units 102, 107 and 201 passed

Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Final12/12/201712/12/201712/12/2017APART
DetailsJim Sly
Final unit 101. Phone #: ###-#### Inspection requested via web by Bob Thornton
OK for Temp. OK for Perm Occ. when Shell Bldg is signed off.
Corrected unit number from 201 to 101 // C_P 12/15/17
BLD-Final12/8/201712/8/201712/8/2017PPART
DetailsJim Sly
Final for unit 303 Phone #: ###-#### Inspection requested via web by Bob Thornton
OK for Temp Occ. OK for Perm Occ. when Shell Bldg is finaled.
FIRE-Final Inspection12/7/201712/7/201712/7/2017APART
DetailsTroy Cobbley
Fire life safety passed in Suites, 101, 202, 207, 208, 301, 303, 304.
BLD-Final11/1/201711/1/201711/1/2017PPART
DetailsJim Sly
Call me when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton
A Temp Occ. is being given, with the Fire Dept's approval for the North building, only per agreement. The agreement includes the Shell/Core and Suites, 103, 104, 105, 106, 203, 204, 205, 206 and 302.
FIRE-Final Inspection11/1/201711/1/201711/1/2017APART
DetailsTroy Cobbley
A temporary occupancy is being given with the fire dept's approval for the north building only as per agreement. This includes the shell/core and Suites 103, 104, 105, 106, 203, 204, 205, 206 and 302
FIRE-Final Inspection10/30/201710/31/201710/31/2017AFAIL
DetailsTroy Cobbley
Not quite ready for temp. I need the panic hardware installed in the north stairwell. Today we also verified the smoke alarms were functional in Suites 103, 104, 105, 106, 203, 204, 205, 206 and 302
FIRE-Final Inspection10/27/201710/30/201710/30/2017ACANC
DetailsTroy Cobbley
As always, call when you are heading this way. Phone #: ###-#### Inspection requested via web by Bob Thornton
FIRE-Final Inspection10/26/201710/27/201710/27/2017AFAIL
DetailsTroy Cobbley
Not ready for a final yet. Today we verified exit signs and emergency lights (two on first and one on third did not work), fire extinguishers appear ok, address appears ok, door hardware except for the access control (not tested yet) appears ok, need fire doors installed and tested at the elevator as well as fire alarm and fire sprinkler finals.
BLD-Conference6/29/20176/30/20176/30/2017ADONE
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover6/27/20176/28/20176/28/2017APASS
DetailsDave Hannah
Inspect 3rd floor soffits for cover Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover6/27/20176/27/20176/27/2017PCANC
DetailsDave Hannah
Look at the 3rd floor corridor and lobby soffit framing. Call me when you are headed this way. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD-Other3/31/20173/31/20173/31/2017APASS
DetailsJim Sly
Look at the fireplace chase in 303 and approve the remaining framing for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover3/1/20173/2/20173/2/2017APASS
DetailsJim Sly
Inspect soffits and dropped ceilings in units 102, 203, 204 205, 206, 207, 302 and 303. Please call me when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Energy code compliance1/31/20171/31/20171/31/2017PPASS
DetailsJim Sly
Inspect 107, 208, 301 and 304 for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover1/24/20171/25/20171/25/2017APASS
DetailsJim Sly
Inspect the soffit framing and dropped ceilings in 103 for cover. Inspect the ceiling in the trash room for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover1/24/20171/25/20171/24/2017ACANC
DetailsDave Hannah
Inspect the soffits and dropped ceilings for cover in 103 Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD-Framing/Rough-in1/23/20171/24/20171/24/2017APASS
DetailsJim Sly
I need the ok to insulate in units 107, 208, 301 and 304. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in1/20/20171/23/20171/23/2017PCANC
DetailsDave Hannah
I need the ok to insulate units 107,208, 301 and 304. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Leonard Butler
BLD-Energy code compliance1/17/20171/17/20171/17/2017APASS
DetailsJim Sly
Units 101, 201 and 207 are insulated and ready for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Other1/12/20171/13/20171/13/2017APASS
DetailsJim Sly
Inspect the soffit and dropped ceiling framing in 104, 105 and 106. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in1/11/20171/12/20171/12/2017PPASS
DetailsJim Sly
Inspect units 101, 201 and 207 Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Energy code compliance1/6/20171/9/20171/9/2017APASS
DetailsJim Sly
Inspect units 102, 202 and 303 for cover. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in1/4/20171/5/20171/5/2017APASS
DetailsJim Sly
Framing inspection for units 102, 202, and 303. Call and I''ll come down. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Energy code compliance12/9/201612/12/201612/13/2016PPART
DetailsJim Sly
Insulation for unit 302 Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in12/7/201612/8/201612/9/2016PPART
DetailsJim Sly
Call me when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton
Room 302....OK.
BLD-Energy code compliance11/18/201611/18/201611/18/2016APASS
DetailsJim Sly
Units 103, 104, 105, 106, 203, 204, 205 and 206 Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Wall cover11/10/201611/10/201611/10/2016PPASS
DetailsJim Sly
Inspect units 103, 104,105 106,203, 204, 205 and 206 to ok for insulation. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Conference10/28/201610/28/201610/31/2016PDONE
DetailsJim Sly
Please call me when you are on your way. I''ll be gone a lot this afternoon. Phone #: ###-#### Inspection requested via web by Bob Thornton
Walk Thru with Bob.
BLD-Wall cover9/26/20169/27/20169/27/2016APART
DetailsJim Sly
Bob Phone #: ###-####
Corridor ceilings OK to cover at three floors.....North Wing.
BLD-Aging Inspection8/3/20168/3/20168/5/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection8/4/20168/4/20168/5/2016 PEND
DetailsDave Hannah
BLD-Conference7/26/20167/27/20167/27/2016ADONE
DetailsJim Sly
South half 1st floor shear walls. 2nd floor shear walls. 3rd floor shear walls. roof nailing. Exterior shear wall nailing. Call me when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Conference7/7/20167/7/20167/7/2016PDONE
DetailsJim Sly
Please call me when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Conference5/16/20165/16/20165/17/2016PDONE
DetailsJim Sly
Jim, Please call when you are on your way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Conference5/11/20165/13/20165/13/2016ACANC
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Footing3/22/20163/22/20163/22/2016PPASS
DetailsPhil Shearer
Column footings. Pending special inspection
BLD-Aging Inspection1/21/20151/21/20151/21/2015 PEND
DetailsPhil Shearer
BLD-Aging Inspection10/22/201410/22/201410/22/2014 PART
DetailsPhil Shearer
Work in progress
BLD-Aging Inspection4/24/20144/24/20144/24/2014 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/23/20141/23/20141/23/2014 PEND
DetailsTom Arcoraci
BLD-Aging Inspection10/24/201310/24/201310/24/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection7/25/20137/25/20137/25/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection4/25/20134/25/20134/25/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection1/24/20131/24/20131/24/2013 PEND
DetailsTom Arcoraci
BLD-Aging Inspection10/25/201210/25/201210/25/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection7/26/20127/26/20127/26/2012 PEND
DetailsTom Arcoraci
BLD-Aging Inspection4/26/20124/26/20124/26/2012 PEND
DetailsTom Arcoraci
BLD-Other1/26/20121/26/20121/26/2012PPEND
DetailsTom Arcoraci
BLD-Other1/25/20121/25/20121/25/2012PPEND
DetailsTom Arcoraci
BLD-Aging Inspection1/25/20121/25/20121/25/2012 PASS
DetailsTom Arcoraci
BLD-Aging Inspection10/26/201110/26/201110/26/2011 PASS
DetailsTom Arcoraci
wip ok
BLD-Aging Inspection7/27/20117/27/20117/27/2011 PASS
DetailsTom Arcoraci
BLD-Aging Inspection4/25/20114/25/20114/25/2011 PART
DetailsTom Arcoraci
BLD-Aging Inspection2/21/20112/21/20112/22/2011 NR
DetailsTom Arcoraci
BLD-Aging Inspection12/20/201012/20/201012/20/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection10/20/201010/20/201010/20/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection8/16/20108/16/20108/17/2010 PART
DetailsTom Arcoraci
BLD-Aging Inspection6/14/20106/14/20106/14/2010 PASS
DetailsTom Arcoraci
BLD-Aging Inspection4/14/20104/14/20104/14/2010 PASS
DetailsTom Arcoraci
BLD-Aging Inspection2/11/20102/11/20102/11/2010 PASS
DetailsTom Arcoraci
BLD-Other11/30/200911/30/200911/30/2009PPASS
DetailsTom Arcoraci
BLD-Aging Inspection11/25/200911/25/200911/30/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection9/25/20099/25/20099/25/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection7/21/20097/21/20097/21/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection5/19/20095/19/20095/19/2009 PASS
DetailsTom Arcoraci
no call for insp
BLD-Aging Inspection3/17/20093/17/20093/17/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection1/14/20091/14/20091/14/2009 PASS
DetailsTom Arcoraci
BLD-Aging Inspection11/14/200811/14/200811/14/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection6/10/20086/10/20086/10/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection3/27/20083/27/20083/27/2008 NR
DetailsTom Arcoraci