FIRE-Final Inspection | 9/3/2008 | 9/4/2008 | 9/4/2008 | A | PASS |
Forrest France
|
|
|
Items on C/N verified for completion, life safety passed.
|
BLD-Final | 9/3/2008 | 9/4/2008 | 9/4/2008 | P | PASS |
Dave Hannah
|
|
|
rob Phone #: ###-#### ok for perm occ
|
BLD-Final | 9/2/2008 | 9/3/2008 | 9/3/2008 | A | CANC |
Dave Hannah
|
|
|
rob Phone #: ###-####
|
FIRE-Final Inspection | 9/2/2008 | 9/2/2008 | 9/2/2008 | P | FAIL |
Forrest France
|
|
|
Need to provide approved hardware at three locations below marked exits or remove signage as discussed, install correct directional arrows at the hall exit sign, hardware at the pocket doors must be compliant.
|
BLD-Other | 8/27/2008 | 8/27/2008 | 8/27/2008 | P | PART |
Dave Hannah
|
|
|
Rob- ceiling Phone #: ###-#### ok to cover ceiling
|
BLD-Framing/Rough-in | 7/25/2008 | 7/28/2008 | 7/28/2008 | A | PASS |
Tony Young
|
|
|
rob Phone #: ###-#### revision ok'd prior for wood studs vs steel studs per contractor,, called arch,, no return call
|
BLD-Framing/Rough-in | 7/23/2008 | 7/23/2008 | 7/23/2008 | P | PART |
Dave Hannah
|
|
|
Rob Phone #: ###-#### ok to insulate and one side after elec r/i check fire blocking
|