BLD-Final | 9/22/2011 | 9/22/2011 | 9/22/2011 | P | PASS |
Mike Jordan
|
|
|
Recieved smoke and falme spread data on cedar wood finish. Ok for perm. occ.
|
BLD-Final | 9/21/2011 | 9/22/2011 | 9/22/2011 | A | FAIL |
Mike Jordan
|
|
|
bryce Phone #: ###-####. Needs to provide smoke and falmespread for ceder finishes.
|
FIRE-Final Inspection | 9/20/2011 | 9/21/2011 | 9/21/2011 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 9/19/2011 | 9/19/2011 | 9/19/2011 | P | NR |
Mike Jordan
|
|
|
levi Phone #: ###-####. NEeds to have fire/life/safety give temp. first.
|
FIRE-Final Inspection | 9/14/2011 | 9/16/2011 | 9/16/2011 | A | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm and fire sprinkler permits need addressed first. Also if all other life safety items are ok a temporary occupancy is ok, per the fire chief, if sprinkler plans have been submitted addressing the rack storage and the anti-freeze valves are locked open. I also noted the fire extinguishers require current inspection tags.
|
FIRE-Conference | 9/13/2011 | 9/13/2011 | 9/13/2011 | P | DONE |
Troy Cobbley
|
|
|
Levi and I went over emergency light placement
|
BLD-Framing/Rough-in | 8/1/2011 | 8/2/2011 | 8/2/2011 | P | PART |
Jim Sly
|
|
|
Brice Phone #: ###-#### OK to cover Restrooms, office, break, select tenant demising and ext.walls......OK to cover full length East/West wall and storage room at NorthEast corner.
|