Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD12-00081
StatusFinaled
Name JC CONSTRUCTORS
Site Address 790 N LANDER ST
Project NameLander Street Wastewater Treat
Customer Number 
ePlanReviewYes
Description
Boise City Public Works Post Aeration Building (Foundation Only) To construct the concrete foundation and underground electrical and plumbing for a 2,000 sq. ft., one story, pre-engineered metal building per approved plans. Work under this permit shall not proceed beyond the pour of the foundation and underground utilities until final approval of plans and issuance of the full building permit. That permit has not yet been applied for. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the early foundation work performed as may be required to comply with the City Codes and the final approved building plans and conditions. All per approved engineered plans on file. NOTE: This building will be fully fire sprinklered. Per the Fire Department conditions of approval (CUP11-00095) this building is required to be fully fire sprinklered throughout. *SJA* ESC12-00024applies to this permit
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  6/4/2013 DONE
Building constructed under permit # BLD12-00342
BLD-Final3/6/20133/7/20133/8/2013PPASS
DetailsTony Young
Jesus Phone #: ###-####
FIRE-Final Inspection1/17/20131/17/20131/17/2013PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Foundation4/12/20124/13/20124/13/2012APART
DetailsTony Young
jesus Phone #: ###-####,, ok pending special inspection
BLD-Footing3/29/20123/30/20123/30/2012APART
DetailsTony Young
jeus Phone #: ###-####,, stem walls,, ok pending special inspection report,, point load footings already poured at the approval of engineer and the S.I.,, pending report
BLD-Footing3/28/20123/29/20123/30/2012PPART
DetailsTony Young
jeus Phone #: ###-####,, work in progress,, pending special inspection report,, NOTE: point load footings already poured,, engineer and special inspector verified,, pending report