DOC - Permit Finaled | | | 6/4/2013 | | DONE |
|
|
|
Building constructed under permit # BLD12-00342
|
BLD-Final | 3/6/2013 | 3/7/2013 | 3/8/2013 | P | PASS |
Tony Young
|
|
|
Jesus Phone #: ###-####
|
FIRE-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Foundation | 4/12/2012 | 4/13/2012 | 4/13/2012 | A | PART |
Tony Young
|
|
|
jesus Phone #: ###-####,, ok pending special inspection
|
BLD-Footing | 3/29/2012 | 3/30/2012 | 3/30/2012 | A | PART |
Tony Young
|
|
|
jeus Phone #: ###-####,, stem walls,, ok pending special inspection report,, point load footings already poured at the approval of engineer and the S.I.,, pending report
|
BLD-Footing | 3/28/2012 | 3/29/2012 | 3/30/2012 | P | PART |
Tony Young
|
|
|
jeus Phone #: ###-####,, work in progress,, pending special inspection report,, NOTE: point load footings already poured,, engineer and special inspector verified,, pending report
|