DOC - Permit Finaled | | | 6/4/2013 | | DONE |
|
|
|
|
BLD-Final | 3/6/2013 | 3/7/2013 | 3/8/2013 | P | PASS |
Tony Young
|
|
|
Jesus Phone #: ###-####
|
FIRE-Final Inspection | 3/6/2013 | 3/7/2013 | 3/7/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 2/26/2013 | 2/26/2013 | 2/26/2013 | P | CANC |
Troy Cobbley
|
|
|
The project related fire alarm permit has not been addressed yet. Jesus and I discussed what is needed.
|
FIRE-Final Inspection | 1/17/2013 | 1/17/2013 | 1/17/2013 | P | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm permit needs addressed, correct fire extinguishers as discussed and the NFPA signs posted.
|
BLD-Other | 9/25/2012 | 9/26/2012 | 9/28/2012 | A | PASS |
Tony Young
|
|
|
jesus - fire wall,, and fire caulk Phone #: ###-####
|
BLD-Other | 9/24/2012 | 9/25/2012 | 9/25/2012 | A | PASS |
Tony Young
|
|
|
jesus - fire wall 3rd layer,, most caulk ok,, missing one area,, will verify next day Phone #: ###-####,,
|
BLD-Wall cover | 9/12/2012 | 9/13/2012 | 9/13/2012 | A | PART |
Tony Young
|
|
|
fire wall 2nd layer - jesus Phone #: ###-####,, 2nd layer ok
|
BLD-Other | 9/13/2012 | 9/14/2012 | 9/13/2012 | A | PASS |
Tony Young
|
|
|
Sheet rock/fire wall inspection please-Jesus Phone #: ###-#### 3rd layer ok
|
BLD-Other | 9/11/2012 | 9/12/2012 | 9/12/2012 | A | PASS |
Tony Young
|
|
|
fire wall - jesus Phone #: ###-####,,, 1st layer ok
|
BLD-Framing/Rough-in | 7/11/2012 | 7/11/2012 | 7/12/2012 | P | PART |
Tony Young
|
|
|
jesus Phone #: ###-####,, frame ok,, verified thermal break between skin and frame on sides and roof,, ok to insulate,, also special inspection verified bolting on main frame "turn of nut"
|