Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD12-03139
StatusFinaled
Name STRAIGHT LINE BUILDING SOLUTIONS LL
Site Address 715 S CAPITOL BLVD
Project NameBoise Public Library
Customer Number 
ePlanReviewNo
Description
(BOISE CITY PUBLIC LIBRARY – Third Floor Remodel) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. Permit is to remodel 3,650 square feet on the third floor. Work is to include: [construction of non-rated interior non-bearing walls to create a new 975 square foot conference room, two small conference rooms, a small office, and to establish a new area for the Idaho Collection], installation of new lighting, installation of new mechanical units (floor supported), installation of accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/9/20138/9/20138/9/2013PPASS
DetailsDave Hannah
rick - call 30 mins prior Phone #: ###-#### ok for perm occ
BLD-Final7/16/20137/17/20137/17/2013PPART
DetailsTony Young
Rick-PLease call prior to insepction Phone #: ###-####,, temp ok,, door lock issue
FIRE-Final Inspection7/16/20137/17/20137/17/2013APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Conference7/11/20137/11/20137/11/2013ADONE
DetailsForrest France
Regarding project finish schedule.
BLD-Framing/Rough-in7/2/20137/3/20137/5/2013PPASS
DetailsDave Hannah
ceiling inspection to cover-Rick-3rd floor Phone #: ###-####
FIRE-Sprinkler Rough-in7/1/20137/1/20137/1/2013PPART
DetailsForrest France
Okay to cover the remainder of grid ceiling areas at the remodel.
BLD-Other6/18/20136/19/20136/19/2013APASS
DetailsDave Hannah
Please call 30min prior to meet GC - Soffit covers on 3rd fl - Rick Phone #: ###-####
BLD-Framing/Rough-in6/3/20136/4/20136/4/2013APART
DetailsDave Hannah
3rd fl - Rick Phone #: ###-#### ok to cover walls
BLD-Final4/30/20135/1/20135/2/2013PCANC
DetailsDave Hannah
phase 1 only//Rick McCoy Phone #: ###-####
FIRE-Sprinkler Rough-in3/25/20133/25/20133/25/2013PPART
DetailsForrest France
Okay to cover fire sprinkler system modifications at the phase one new ceilings.
BLD-Framing/Rough-in3/22/20133/25/20133/25/2013APART
DetailsTony Young
Please call at least 30 mins prior to inspection--Rick Phone #: ###-####,, west side 1st phase walls and furr outs and cloud ceilings ok