BLD-Final | 8/9/2013 | 8/9/2013 | 8/9/2013 | P | PASS |
Dave Hannah
|
|
|
rick - call 30 mins prior Phone #: ###-#### ok for perm occ
|
BLD-Final | 7/16/2013 | 7/17/2013 | 7/17/2013 | P | PART |
Tony Young
|
|
|
Rick-PLease call prior to insepction Phone #: ###-####,, temp ok,, door lock issue
|
FIRE-Final Inspection | 7/16/2013 | 7/17/2013 | 7/17/2013 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Conference | 7/11/2013 | 7/11/2013 | 7/11/2013 | A | DONE |
Forrest France
|
|
|
Regarding project finish schedule.
|
BLD-Framing/Rough-in | 7/2/2013 | 7/3/2013 | 7/5/2013 | P | PASS |
Dave Hannah
|
|
|
ceiling inspection to cover-Rick-3rd floor Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 7/1/2013 | 7/1/2013 | 7/1/2013 | P | PART |
Forrest France
|
|
|
Okay to cover the remainder of grid ceiling areas at the remodel.
|
BLD-Other | 6/18/2013 | 6/19/2013 | 6/19/2013 | A | PASS |
Dave Hannah
|
|
|
Please call 30min prior to meet GC - Soffit covers on 3rd fl - Rick Phone #: ###-####
|
BLD-Framing/Rough-in | 6/3/2013 | 6/4/2013 | 6/4/2013 | A | PART |
Dave Hannah
|
|
|
3rd fl - Rick Phone #: ###-#### ok to cover walls
|
BLD-Final | 4/30/2013 | 5/1/2013 | 5/2/2013 | P | CANC |
Dave Hannah
|
|
|
phase 1 only//Rick McCoy Phone #: ###-####
|
FIRE-Sprinkler Rough-in | 3/25/2013 | 3/25/2013 | 3/25/2013 | P | PART |
Forrest France
|
|
|
Okay to cover fire sprinkler system modifications at the phase one new ceilings.
|
BLD-Framing/Rough-in | 3/22/2013 | 3/25/2013 | 3/25/2013 | A | PART |
Tony Young
|
|
|
Please call at least 30 mins prior to inspection--Rick Phone #: ###-####,, west side 1st phase walls and furr outs and cloud ceilings ok
|