Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD13-00789
StatusFinaled
Name C2 CONSTRUCTION
Site Address 2015 N CURTIS RD
Project NameKOELSCH ELEMENTARY
Customer Number 
ePlanReviewNo
Description
(KOELSCH ELEMENTARY SCHOOL) Permit includes infilling existing areas of window with new wall and replacing existing windows. This building is fully sprinklered for one-hour substitution. The new wall systems will be in compliance with attached modification for energy code compliance. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/28/20138/29/20138/29/2013PPASS
DetailsJim Sly
miguel Phone #: ###-#### C/C issued
DOC - Permit Finaled8/29/20138/29/20138/29/2013PPASS
DetailsJim Sly
FIRE-Final Inspection8/26/20138/26/20138/26/2013PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Framing/Rough-in7/30/20137/30/20137/30/2013PPASS
DetailsTom Arcoraci
Miguel Phone #: ###-####
BLD-Energy code compliance7/22/20137/22/20137/22/2013PPASS
DetailsTom Arcoraci
BLD-Foundation7/22/20137/22/20137/22/2013PCANC
DetailsTom Arcoraci
miguel Phone #: ###-####
BLD-Framing/Rough-in7/18/20137/18/20137/18/2013PPASS
DetailsTom Arcoraci
Miguel Phone #: ###-#### wip ok
BLD-Energy code compliance7/12/20137/12/20137/12/2013PPASS
DetailsTom Arcoraci
Miguel Phone #: ###-####
BLD-Framing/Rough-in7/9/20137/9/20137/9/2013PPASS
DetailsTom Arcoraci
miguel Phone #: ###-#### wip ok
BLD-Energy code compliance7/8/20137/8/20137/8/2013PPASS
DetailsMike Jordan
miguel Phone #: ###-####. Wing B classroom side.
BLD-Framing/Rough-in7/8/20137/8/20137/8/2013PPASS
DetailsMike Jordan
miguel Phone #: ###-####. Wing C hallway side.
BLD-Framing/Rough-in7/2/20137/2/20137/2/2013PPART
DetailsJim Sly
miguel Phone #: ###-####
Energy....Corridor wing B OK Framing....... wing B classrooms OK.
BLD-Framing/Rough-in6/21/20136/21/20136/21/2013PPASS
DetailsMike Jordan
Miguel Phone #: ###-####. B wing corridor side and corridor between A and B wing.
BLD-Energy code compliance6/21/20136/21/20136/21/2013PPASS
DetailsMike Jordan
Miguel Phone #: ###-####. A wing corridor side.
BLD-Energy code compliance6/19/20136/20/20136/20/2013APASS
DetailsMike Jordan
miguel Phone #: ###-####. A wing classrooms.
BLD-Framing/Rough-in6/20/20136/20/20136/20/2013APASS
DetailsMike Jordan
miguel Phone #: ###-####. Wing A corridor side ok. Spoke to architect regarding headers and existing beam supports. Beams on corridor side are supported via tube steel columns in classroom wall on corridor side. beams then cantilever out. ok to insulate.
BLD-Framing/Rough-in6/17/20136/17/20136/17/2013PPASS
DetailsMike Jordan
Miguel Phone #: ###-####. Framed wall infill and windows at A wing. ok to insulate.