FIRE-Final Inspection | 1/10/2014 | 1/13/2014 | 1/13/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 1/10/2014 | 1/10/2014 | 1/10/2014 | P | PASS |
Mike Jordan
|
|
|
Bob Phone #: ###-####. Will be ok for perm occ when zoning sign perm.
|
FIRE-Final Inspection | 12/30/2013 | 12/31/2013 | 12/31/2013 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Romeo's permission until the project related fire alarm permit has been finaled.
|
BLD-Final | 12/30/2013 | 12/31/2013 | 12/31/2013 | P | PART |
Mike Jordan
|
|
|
Bob Phone #: ###-####. Ok for temp occ. Will be ok for perm. occ. once fire/life/safety signs perm.
|
FIRE-Final Inspection | 12/27/2013 | 12/30/2013 | 12/30/2013 | P | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm permit needs to be inspected and all of the existing exit signs and emergency lights need to be repaired.
|
BLD-Ceiling Grid Inspection | 12/19/2013 | 12/20/2013 | 12/20/2013 | P | PASS |
Mike Jordan
|
|
|
bob Phone #: ###-####
|
BLD-Framing/Rough-in | 12/4/2013 | 12/5/2013 | 12/5/2013 | P | PASS |
Jim Storey
|
|
|
Bob Phone #: ###-####
|
BLD-Framing/Rough-in | 12/2/2013 | 12/3/2013 | 12/3/2013 | P | PASS |
Mike Jordan
|
|
|
Bob Phone #: ###-####. INterior steel stud walls for open offices, north half ok.
|
BLD-Framing/Rough-in | 11/22/2013 | 11/25/2013 | 11/25/2013 | A | PART |
Mike Jordan
|
|
|
Bob Phone #: ###-####. South half, interior steel stud framed walls foropen offices and enclosed offices. Needs to provide the approved plans. ok to sheet rock south half.
|