BLD-Final | 4/16/2014 | 4/17/2014 | 4/17/2014 | A | PASS |
Dave Hannah
|
|
|
Kyle Phone #: ###-####
|
FIRE-Final Inspection | 4/16/2014 | 4/17/2014 | 4/17/2014 | A | PASS |
Forrest France
|
|
|
Verified remainder of work is completed. Fire life safety final approved.
|
BLD-Final | 3/26/2014 | 3/27/2014 | 3/27/2014 | P | PART |
Dave Hannah
|
|
|
Kyle Phone #: ###-#### ok for temp occ ok for perm occ after fire gos perm
|
FIRE-Final Inspection | 3/26/2014 | 3/27/2014 | 3/27/2014 | A | PART |
Forrest France
|
|
|
Fire life safety final pending installation of a knox box per plan review notes. Remainder of corrections and adjustments completed. Temporary occupancy approved.
|
FIRE-Final Inspection | 3/26/2014 | 3/26/2014 | 3/26/2014 | A | NR |
Forrest France
|
|
|
Project related FIR trade work including the fire alarm and sprinkler permit finals pending, need to post signage at the main entry/exit, remove mag lock or provide relay to the fire alarm system at the east exit door, post signage at the courtyard exit door, missing knox box, post signage at the riser room door, noted some exit signs not functional on battery backup. Discussed project schedule for permit finals.
|
BLD-Final | 3/25/2014 | 3/25/2014 | 3/25/2014 | P | NR |
Dave Hannah
|
|
|
Kyle Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/10/2014 | 3/10/2014 | 3/10/2014 | P | PASS |
Jim Storey
|
|
|
Kyle Dunstan Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/6/2014 | 3/7/2014 | 3/7/2014 | A | FAIL |
Dave Hannah
|
|
|
Kyle Phone #: ###-#### new grid needs to be cliped or install spradder bars at perm.
|
BLD-Framing/Rough-in | 2/14/2014 | 2/14/2014 | 2/14/2014 | P | CANC |
Jim Sly
|
|
|
kyle Phone #: ###-#### Dave Hannah called me and said it was done.
|
BLD-Framing/Rough-in | 2/11/2014 | 2/11/2014 | 2/12/2014 | P | PASS |
Dave Hannah
|
|
|
KYLE Phone #: ###-####
|
BLD-Footing | 1/22/2014 | 1/22/2014 | 1/22/2014 | P | PASS |
Dave Hannah
|
|
|
dan Phone #: ###-####
|