BLD-Final | 6/13/2014 | 6/13/2014 | 6/13/2014 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Final | 4/25/2014 | 4/25/2014 | 4/25/2014 | P | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-#### ok for temp occ needs to install door
|
FIRE-Final Inspection | 4/25/2014 | 4/25/2014 | 4/25/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety final approved.
|
FIRE-Conference | 3/31/2014 | 3/31/2014 | 3/31/2014 | A | DONE |
Forrest France
|
|
|
On site conference regarding project related trade work, egress lighting, fire extinguisher locations, etc.
|
BLD-Final | 3/25/2014 | 3/26/2014 | 3/26/2014 | P | NR |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
FIRE-Final Inspection | 3/25/2014 | 3/26/2014 | 3/26/2014 | P | FAIL |
Forrest France
|
|
|
Items per plan review annotations are incomplete- need to provide exit signs, egress lighting, PFE, max occ. sign, extend occupant notification, reverse door swing at one location.
|