BLD-Aging Inspection | 6/6/2019 | 6/6/2019 | 6/11/2019 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/5/2019 | 6/5/2019 | 6/10/2019 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 1/22/2019 | 1/23/2019 | 1/22/2019 | A | PASS |
Dave Hannah
|
|
|
Antonio Phone #: ###-#### call first
|
Extend Permit 90/180 days | 1/17/2019 | 1/22/2019 | 1/22/2019 | A | CANC |
Dave Hannah
|
|
|
Antonio Phone #: ###-#### call first
|
BLD-Final | 1/16/2019 | 1/17/2019 | 1/17/2019 | A | DEFR |
Dave Hannah
|
|
|
Antonio Phone #: ###-#### talked with antonio hes ok with waiting for tony
|
FIRE-Final Inspection | 1/10/2019 | 1/16/2019 | 1/16/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection for core and shell complete, final fire alarm inspection for core and shell complete, fire extinguishers are placed with current inspection tags, knox box is located by front entry. Final life fire safety inspection for core and shell complete, no occupancy allowed under this permit, a seperate permit will be required for tenant occupancy.
Antonio Phone #: ###-####
|
BLD-Conference | 10/15/2018 | 10/16/2018 | 10/16/2018 | A | PART |
Tony Young
|
|
|
Chris-please call 30 minutes prior to meet for access Phone #: ###-####,, hand and guard rail ?s
|
BLD - Request for Extension | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PEND |
Tony Young
|
|
|
request to extend exp date so can complete project // Not need site visit
|
BLD-Conference | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PART |
Tony Young
|
|
|
Call Larry Sundell to set up time to meet ###-####. Wants to walk through project with you.,, needs trades,, hand rails,, etc
|
BLD-Conference | 8/10/2018 | 8/15/2018 | 8/16/2018 | P | PART |
Tony Young
|
|
|
Call Larry Sundell to set up time to meet ###-####. Wants to walk through project with you.
|
BLD-Conference | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | CANC |
Tony Young
|
|
|
Call Larry Sundell to meet to see what neeed to finish project ###-#### ***CANC PER LARRY***
|
BLD-Aging Inspection | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | FAIL |
Tony Young
|
|
|
should this one be expired
|
DOC - Permit Expired | 5/15/2018 | 5/15/2018 | 5/15/2018 | P | CANC |
Tony Young
|
|
|
should this one be expired.. yes,, no work going on
|
BLD-Aging Inspection | 1/5/2017 | 1/5/2017 | 1/11/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/4/2017 | 1/4/2017 | 1/11/2017 | | PEND |
Tony Young
|
|
|
|
FIRE-Final Inspection | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | PART |
Jim Page
|
|
|
Spoke with point of contact, Jay Phone #: ###-####, discussed location for fire alarm document cabinet in fire sprinkler riser room. Jay is requesting a partial final for exterior life fire safety, property has an active fire sprinkler system, property has an active fire panel, final inspection is for exterior no fire extinguishers are required for exterior. Temporary construction fencing in place at time of inspection which cannot stay in place when property is occupied. When building becomes occupied the fencing needs to be removed or a gate with impact/single action hardware will need to be installed. Partial fire life safety final inspection for exterior passed/complete
|
BLD-Conference | 7/1/2016 | 7/5/2016 | 7/5/2016 | A | PART |
Tony Young
|
|
|
Jay Phone #: ###-####,, floor/ ceiling penetrations ok,, shell ok pending other trades
|
BLD-Other | 6/17/2016 | 6/20/2016 | 6/21/2016 | A | PART |
Tony Young
|
|
|
Jay Phone #: ###-####,, follow up,, add collars to bigger pipes,, fire caulk around all penetrations
|
BLD-Conference | 6/14/2016 | 6/17/2016 | 6/17/2016 | A | PART |
Tony Young
|
|
|
Jay Phone #: ###-####,, follow up,, working on floor/ceiling penetrations
|
BLD-Conference | 6/13/2016 | 6/14/2016 | 6/14/2016 | A | PEND |
Tony Young
|
|
|
Jay Phone #: ###-####
|
BLD-Conference | 6/13/2016 | 6/13/2016 | 6/13/2016 | P | DEFR |
Tony Young
|
|
|
Jay Phone #: ###-####,, wanted a am inspection
|
BLD-Final | 6/8/2016 | 6/13/2016 | 6/13/2016 | A | CANC |
Dave Hannah
|
|
|
Jay-as per Jay inspection is for concrete fillings on top floor Phone #: ###-####
|
BLD-Aging Inspection | 1/19/2016 | 1/19/2016 | 1/21/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 1/18/2016 | 1/18/2016 | 1/21/2016 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 11/20/2015 | 11/23/2015 | 11/23/2015 | A | PEND |
Tony Young
|
|
|
would like call ahead; Jay Phone #: ###-####,, final on shell
|
BLD-Conference | 11/18/2015 | 11/19/2015 | 11/20/2015 | P | DEFR |
Tony Young
|
|
|
would like call ahead; Jay Phone #: ###-####,, final on shell
|
BLD-Conference | 11/17/2015 | 11/18/2015 | 11/18/2015 | A | PEND |
Tony Young
|
|
|
would like call ahead; Jay Phone #: ###-####,, final on shell
|
BLD-Conference | 11/16/2015 | 11/17/2015 | 11/17/2015 | A | DEFR |
Tony Young
|
|
|
would like call ahead; Jay Phone #: ###-####,, final on shell
|
BLD-Conference | 11/16/2015 | 11/16/2015 | 11/16/2015 | P | PEND |
Tony Young
|
|
|
would like call ahead; Jay Phone #: ###-####,, final on shell,, exterior looking ok,, will do research on final from others
|
BLD-Final | 11/13/2015 | 11/16/2015 | 11/16/2015 | P | PEND |
Tony Young
|
|
|
would like call ahead; Jay Phone #: ###-####
|
BLD-Final | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | NR |
Dave Hannah
|
|
|
Jay Phone #: ###-####
|
FIRE-Final Inspection | 11/12/2015 | 11/12/2015 | 11/12/2015 | P | CANC |
Jim Page
|
|
|
Inspection not for this permit number, inspection was for FIR14-00912, items still need to be addressed before inspection can be performed. Jay will reschedule inspection when items are repaired for the fire sprinkler system.
|
BLD-Conference | 11/10/2015 | 11/12/2015 | 11/12/2015 | A | CANC |
Tony Young
|
|
|
Jay Phone #: ###-#### needed a firelife saftey not a conference
|
FIRE-Conference | 10/12/2015 | 10/12/2015 | 10/12/2015 | P | DONE |
Jim Page
|
|
|
Fire conference complete
|
BLD-Conference | 10/8/2015 | 10/9/2015 | 10/9/2015 | A | PASS |
Tony Young
|
|
|
Jay Phone #: ###-####,, ?s on shell
|
BLD-Conference | 7/31/2015 | 7/31/2015 | 7/31/2015 | P | PART |
Tony Young
|
|
|
Jay Phone #: ###-####,, meet with 325,, 2 pm,, walk through,, had the office get a MIS permit,, and schedule all trades out ther next thursday @ 2,, 8/6/2015
|
BLD-Conference | 7/30/2015 | 7/31/2015 | 7/31/2015 | A | DEFR |
Tony Young
|
|
|
Jay Phone #: ###-####,, meet with 325,, to 2 pm
|
BLD-Conference | 7/30/2015 | 7/31/2015 | 7/31/2015 | A | PART |
Bob Archibald
|
|
|
Jay Phone #: ###-####,, meet with 415,, late am. Conference on requirements for shell only. need TI permits for interior .
|
BLD-Conference | 7/30/2015 | 7/30/2015 | 7/30/2015 | P | PEND |
Tony Young
|
|
|
Jay Phone #: ###-####,, walk through only,, need to meet with 325
|