Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD15-00199
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1055 N CURTIS RD
Project NameSaint Als North Tower 2nd Flr
Customer Number 
ePlanReviewNo
Description
(SAINT ALPHONSUS REGIONAL MEDICAL CENTER - 2ND STORY - NORTH TOWER) Fire sprinkler system used for occupancy and for high-rise. To remodel 4 areas located on the 2nd story of the North Tower (1,125 square feet, 313 square feet, 175 square feet, and 1,063 square feet) of the Saint Alphonsus Regional Medical Center. The pharmacy will be moved and the cancer care clinic will be expanded. Work is to include interior nonbearing walls, a 2-hr fire barrier wall infill at a mechanical shaft, a short segment of smoke barrier wall, smoke partition infills, a 1-hr fire barrier wall as an incidental use separation, a restroom accessible to the disabled, suspended acoustical ceilings, gypsum board soffits, fume hoods and exhaust ducts, millwork, exam room sinks, a mop sink, and finishes. The existing medical gas system (oxygen) will be extended to serve the new exam rooms. The existing smoke partitions that create I-2 Occupancy corridors and care suites are required to be maintained. Existing smoke barriers that create smoke compartments are required to be maintained. Existing 2-hr fire barriers that create stairway enclosures and shafts are required to be maintained. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate permits are required for alterations to these systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/20/201510/21/201510/21/2015APASS
DetailsMike Jordan
Cecil Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection10/19/201510/20/201510/20/2015APASS
DetailsTroy Cobbley
life safety passed
BLD-Ceiling Grid Inspection10/2/201510/2/201510/2/2015PPASS
DetailsJim Sly
Ceizel Phone #: ###-####
BLD-Framing/Rough-in8/31/20158/31/20158/31/2015PPASS
DetailsMike Jordan
Cecil Phone #: ###-####
BLD-Final7/27/20157/28/20157/28/2015PPART
DetailsMike Jordan
Ceicel Phone #: ###-####. Ok to occupy phase 3.
FIRE-Final Inspection7/27/20157/28/20157/28/2015APART
DetailsTroy Cobbley
Phase 3 life safety passed
FIRE-Final Inspection7/7/20157/7/20157/7/2015PPART
DetailsTroy Cobbley
Rooms 206, 207 and the associated offices life safety is passed. This is a phased project.
FIRE-Final Inspection7/1/20157/6/20157/6/2015ACANC
DetailsTroy Cobbley
Jeff is canceling until the project related fire alarm permit can be scheduled.
BLD-Ceiling Grid Inspection6/26/20156/26/20156/26/2015PPASS
DetailsMike Jordan
Cecil Phone #: ###-####
BLD-Framing/Rough-in6/17/20156/17/20156/17/2015PPASS
DetailsMike Jordan
Cesul Phone #: ###-####. phase 2 pharmacy ok for cover.
BLD-Framing/Rough-in4/24/20154/24/20154/24/2015PPASS
DetailsMike Jordan
Sycel Phone #: ###-####. Interior steel stud framed wall to creat a office and janitors closet.