Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD15-02559
StatusFinaled
Name SUMMIT DEVELOPMENT INC
Site Address 10670 W JEWELL LN
Project NameCordillera Phase 2 Building 1
Customer Number 
ePlanReviewNo
Description
(CORDILLERA DEVELOPMENT PHASE 2 - BLDG 1) revisons to footing calculations and 310 form. **10/8/15 ajs**To construct a new 3,680 sq. ft., two story, Four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partition separations are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. **AJS**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/16/20169/19/20169/19/2016APASS
DetailsMike Jordan
Dave Phone #: ###-####
BLD-Aging Inspection6/10/20166/10/20166/10/2016 PEND
DetailsMike Jordan
Pending zoning?
BLD-Final2/24/20162/25/20162/25/2016APART
DetailsMike Jordan
Kelly Phone #: ###-####. OK for temp occ. Will be ok for perm occ. once zoning signs perm.
FIRE-Final Inspection2/24/20162/24/20162/24/2016PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Final2/22/20162/23/20162/23/2016ANR
DetailsMike Jordan
Kelly Phone #: ###-####. Needs zoning and public works finals. Life/safety has failed. Needs to install handrail in unit #103. Carpet not installed.
FIRE-Final Inspection2/19/20162/19/20162/19/2016PFAIL
DetailsTroy Cobbley
exposed pipe in Laundry Room and ceiling missing at one head in apartments 102 and 103
BLD-Framing/Rough-in1/5/20161/5/20161/5/2016PPASS
DetailsMike Jordan
Kelly Phone #: ###-####
BLD-Energy code compliance1/5/20161/5/20161/5/2016PPASS
DetailsMike Jordan
Kelly Phone #: ###-####
BLD-Framing/Rough-in12/31/201512/31/201512/31/2015PFAIL
DetailsMike Jordan
Kelly Phone #: ###-####. Correction notice posted. Ok to insulate.
BLD-Wall Bracing12/30/201512/30/201512/30/2015PPASS
DetailsJim Storey
Shear // Kelly Phone #: ###-####
BLD-Wall Bracing11/17/201511/17/201511/17/2015PNR
DetailsJim Sly
Kelly Phone #: ###-####
Called Contractor. Several Buildings on site ......No address #s posted ......No Erosion Control Placards installed.......No inspection performed.
BLD-Wall Bracing11/6/201511/6/201511/6/2015PPASS
DetailsMike Jordan
Kelly Phone #: ###-####
BLD-Wall Bracing11/5/201511/5/201511/5/2015PPASS
DetailsMike Jordan
Kelly Phone #: ###-####
BLD-Wall cover10/22/201510/22/201510/22/2015PPASS
DetailsMike Jordan
Shear // Justin Phone #: ###-####
BLD-Footing10/15/201510/16/201510/16/2015APASS
DetailsMike Jordan
Dave Phone #: ###-####
BLD-Footing10/15/201510/15/201510/15/2015PPASS
DetailsMike Jordan
Interior thicken footings.
BLD-Energy code compliance10/12/201510/13/201510/13/2015APASS
DetailsMike Jordan
Insulation // Rob Phone #: ###-####. Rigid insulation on stemwall ok.
BLD-Foundation10/6/201510/7/201510/8/2015APART
DetailsMike Jordan
Manuel Phone #: ###-####. reinforcement ok. approved plans show that special inspection is required. contractor has not provided any other documentation staing otherwise.
BLD-Energy code compliance10/5/201510/5/201510/5/2015PCANC
DetailsMike Jordan
Rob Phone #: ###-####
BLD-Footing10/2/201510/5/201510/5/2015APASS
DetailsMike Jordan
Manuel Phone #: ###-####