Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD15-02561
StatusFinaled
Name SUMMIT DEVELOPMENT INC
Site Address 10722 W JEWELL LN
Project NameCordillera Phase 3 Building 3
Customer NumberBLD15-02559
ePlanReviewNo
Description
(CORDILLERA DEVELOPMENT PHASE 2 - BLDG 3)revisons to footing calculations and 310 form. **10/8/15 ajs** To construct a new 3,680 sq. ft., two story, Four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partition separations are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. **AJS**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/16/20169/19/20169/19/2016APASS
DetailsMike Jordan
Dave Phone #: ###-####
BLD-Aging Inspection7/20/20167/20/20167/20/2016 PASS
DetailsMike Jordan
BLD-Final2/24/20162/25/20162/25/2016APART
DetailsMike Jordan
Kelly Phone #: ###-####. OK for termp occ. Will be ok for perm occ. once zoning signs perm.
FIRE-Final Inspection2/24/20162/24/20162/24/2016PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Final2/22/20162/23/20162/23/2016AFAIL
DetailsMike Jordan
Kelly Phone #: ###-####. Needs to fire cailk penetrations in fire riser room, everything else ok. Correction notice issued. Also needs zoning, public works finals as well. Fire/life/safety final has failed.
BLD-Final2/19/20162/19/20162/19/2016PNR
DetailsMike Jordan
Kelly Phone #: ###-####. Needs life/safety, zoning and public works.
FIRE-Final Inspection2/19/20162/19/20162/19/2016PFAIL
DetailsTroy Cobbley
exposed pipe in Laundry Room and ceiling missing at one head in apartment 104
BLD-Framing/Rough-in12/16/201512/17/201512/17/2015APASS
DetailsJim Sly
Kelly Phone #: ###-####
BLD-Framing/Rough-in12/15/201512/16/201512/16/2015PDEFR
DetailsJim Storey
Kelly Phone #: ###-#### out of time
BLD-Framing/Rough-in12/8/201512/9/201512/9/2015PFAIL
DetailsMike Jordan
Kelly Phone #: ###-####. Provide fix ffrom joist manufacturer for cut top chords on floor joist in unit 102. Fire caulk in riser room, Complete draft stop in attic above tub, unit 104. Correction notice posted, ok to insulate.
BLD-Wall Bracing10/30/201510/30/201510/30/2015PPASS
DetailsMike Jordan
would like call ahead; Kelly Phone #: ###-####
BLD-Foundation10/19/201510/19/201510/19/2015PPASS
DetailsMike Jordan
Rebar // Dave Phone #: ###-####
BLD-Energy code compliance10/7/201510/7/201510/7/2015PPASS
DetailsMike Jordan
Rob Phone #: ###-####. rigid insulation at stemwall.
BLD-Foundation10/2/201510/2/201510/2/2015PPASS
DetailsJim Sly
Manuel Phone #: ###-####
BLD-Footing9/30/201510/1/201510/1/2015APASS
DetailsJim Sly
Manual Phone #: ###-####