Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD16-00142
StatusFinaled
Name PATRICK INDUSTRIES
Site Address 8455 W WESTPARK ST
Project NamePatrick Industries
Customer Number 
ePlanReviewYes
Description
**( PATRICK INDUSTRIES)** //Plan modification to add a mechanical dust collection system at the warehouse area, to remove warehouse restrooms and to enlarge existing 10’ x 10’ exterior overhead door to a 16’ x 16’ exterior overhead door. Note: special inspection required. 3-18-2016 JG. // Permit is to remodel an existing 75,816 sq. ft. sq. ft. office/warehouse building. Approval is contingent upon adhering to the approved plans on file. Work to include: new light fixtures in warehouse. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/12/201612/16/201612/16/2016APASS
DetailsMike Jordan
Please call ahead for access - James Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection12/8/201612/12/201612/12/2016APASS
DetailsTroy Cobbley
Life safety passed. The owner is going to change out the exit sign at the main door to a combo exit sign/emergency light. I requested that he verify functionality with the building inspector.
BLD-Final9/8/20169/9/20169/12/2016PNR
DetailsMike Jordan
James Phone #: ###-####
FIRE-Final Inspection9/8/20169/9/20169/9/2016AFAIL
DetailsTroy Cobbley
Provide racking permit for storage racks over 8'-0", All storage to remain under 12'-0" (6'-0") or a high pile permit is required, Provide exit sign on second floor, Repair all exit signs and emregency lights, Provide sprinkler protection under the new door and platform.
DOC - Permit Finaled9/9/20169/9/20169/9/2016PCANC
DetailsMike Jordan
(This activity was added in error so we have changed the case status back to Issued.)
BLD-Final8/31/20169/7/20169/7/2016PFAIL
DetailsMike Jordan
James Phone #: ###-####. tenant to provide city approved plans. Per tenant architect is working racking permit to submit for review. Once tenant has approved plans, they will schedule a building conferance. Also noted work in adjacent building. Per tenant architect is working on those plans as well. Noted that mech contractor has pulled his prmit for work in adjacent building.
FIRE-Final Inspection8/31/20168/31/20168/31/2016PFAIL
DetailsTroy Cobbley
No approved plans or small documents on site. I went over general life safety requirements with the Operations Manager. It appears a racking permit will be required.

James Phone #: ###-####