BLD-Final | 5/18/2016 | 5/19/2016 | 5/19/2016 | A | PASS |
Mike Jordan
|
|
|
James Phone #: ###-####. Issue resolved. ok for perm occ.
|
BLD-Final | 5/17/2016 | 5/18/2016 | 5/18/2016 | P | PART |
Mike Jordan
|
|
|
James Phone #: ###-####. ok for temp occ. Needs to cut racking down to 8ft.
|
FIRE-Final Inspection | 5/16/2016 | 5/17/2016 | 5/17/2016 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. I dicussed with James that a racking permit may be required due to the storage racks that exceed 8'. They are light duty racks.
|
BLD-Ceiling Grid Inspection | 5/16/2016 | 5/16/2016 | 5/16/2016 | P | PASS |
Mike Jordan
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | PART |
Mike Jordan
|
|
|
David Phone #: ###-####. hard ceiling ok. pending electrical and fire sprinkler.
|
BLD-Framing/Rough-in | 4/27/2016 | 4/28/2016 | 4/28/2016 | P | PASS |
Mike Jordan
|
|
|
Fransisco Phone #: ###-####. Interior steel stud framed walls and bathroom hardlids ok.
|
BLD-Framing/Rough-in | 4/25/2016 | 4/25/2016 | 4/25/2016 | P | PART |
Jim Sly
|
|
|
Francisco Phone #: ###-#### North 1/3rd of room and store front ....(FRONT) only .....OK to cover.
|