BLD-Aging Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | | PASS |
Jim Storey
|
|
|
zonning bond pending.
|
BLD-Aging Inspection | 11/26/2018 | 11/26/2018 | 11/26/2018 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 9/24/2018 | 9/24/2018 | 9/24/2018 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 | | PASS |
Jim Storey
|
|
|
|
BLD-Final | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
FIRE-Final Inspection | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
|
BLD-Final | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | PART |
Jim Storey
|
|
|
Dave Phone #: ###-#### Dave Phone #: ###-#### Received call from project owner Dave O’Neal regarding request for TCO on a single unit while field inspector correction items (smoke alarm placement) are being corrected. Let Dave know that if the structural field inspector is equally supportive relative to other correction items that may exist from the structural field inspector are satisfactory; the fire/life safety inspection group is OK with a single tenant initiating the move in process while the subject smoke alarm issue is being resolved by the licensed electrician. Once device is relocated, a final inspection request can be made. Contacted fire life safety field inspector to notify of discussion with owner. / handrail extention to be resolved with planreview// note per fire
|
BLD-Final | 3/5/2018 | 3/6/2018 | 3/6/2018 | P | DEFR |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
FIRE-Final Inspection | 3/5/2018 | 3/6/2018 | 3/6/2018 | A | PART |
Troy Cobbley
|
|
|
See note per Scott Arellano
|
BLD-Aging Inspection | 1/25/2018 | 1/25/2018 | 1/25/2018 | | PASS |
Jim Storey
|
|
|
work in progress
|
BLD-Energy code compliance | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | PASS |
Brandon Shaw
|
|
|
OK to cover
|
BLD-Framing/Rough-in | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | PASS |
Brandon Shaw
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 9/7/2017 | 9/8/2017 | 9/8/2017 | P | PART |
Brandon Shaw
|
|
|
BLD A, site 1 OK to insulate
|
BLD-Framing/Rough-in | 8/29/2017 | 8/29/2017 | 8/29/2017 | P | NR |
Jim Storey
|
|
|
Wall inspection - David Phone #: ###-####
|
BLD-Wall Bracing | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Jim Storey
|
|
|
Shear // Dave Phone Phone #: ###-####
|
BLD-Foundation | 2/23/2017 | 2/24/2017 | 2/24/2017 | P | PASS |
Jim Storey
|
|
|
Jerry Phone #: ###-####
|
BLD-Footing | 2/22/2017 | 2/23/2017 | 2/23/2017 | P | PASS |
Jim Storey
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 2/21/2017 | 2/22/2017 | 2/22/2017 | P | NR |
Mike Jordan
|
|
|
Dane Phone #: ###-####. Will reschedule.
|
BLD-Conference | 12/28/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Jim Storey
|
|
|
cody Phone #: ###-####
|