BLD-Final | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Dave Hannah
|
|
|
Dick Phone #: ###-####
|
BLD-Final | 7/26/2017 | 7/27/2017 | 7/27/2017 | A | CANC |
Mike Jordan
|
|
|
Dick Phone #: ###-####
|
FIRE-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Building inspector will verify that the correct hardware is installed on the east exit door.
|
FIRE-Final Inspection | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide inspection/sign off for the Grading permit, provide lever hardware for the east exit door, provide single action hardware for the interior doors, repair exit sign/emergency light on the mezzanine.
Dante Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/12/2017 | 5/15/2017 | 5/15/2017 | A | PASS |
Jim Sly
|
|
|
Dante-t-grid Phone #: ###-####
|
BLD-Energy code compliance | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Mike Jordan
|
|
|
Dante Phone #: ###-####
|
BLD-Wall Bracing | 2/13/2017 | 2/13/2017 | 2/13/2017 | P | PASS |
Mike Jordan
|
|
|
Dante Phone #: ###-####
|
BLD-Energy code compliance | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Dave Hannah
|
|
|
Dante Phone #: ###-####
|
BLD-Framing/Rough-in | 2/2/2017 | 2/2/2017 | 2/2/2017 | P | PASS |
Mike Jordan
|
|
|
Dante Phone #: ###-####
|
BLD-Energy code compliance | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Mike Jordan
|
|
|
late afternoon - Dante Phone #: ###-####
|
BLD-Energy code compliance | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
Mike Jordan
|
|
|
Dante Phone #: ###-####. Roof ok.
|