BLD-Final | 8/31/2016 | 9/1/2016 | 9/1/2016 | P | PASS |
Mike Jordan
|
|
|
Doug Phone #: ###-####. OK for perm occ.
|
FIRE-Final Inspection | 8/31/2016 | 9/1/2016 | 9/1/2016 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Doug to remove thumbturn deadbolt at main exit as per discussion
|
BLD-Final | 8/30/2016 | 8/31/2016 | 8/31/2016 | P | NR |
Mike Jordan
|
|
|
Doug Phone #: ###-####-please call 1 hour prior to meet. Fire/life/safety failed.
|
FIRE-Final Inspection | 8/30/2016 | 8/31/2016 | 8/31/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware for all doors per the approved plans, remove the deadbolts from the south exit doors, provide exit sign per the approved plans.
|
BLD-Framing/Rough-in | 8/22/2016 | 8/23/2016 | 8/23/2016 | P | PASS |
Phil Shearer
|
|
|
Please call Dutch 1 hr prior to arrival thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon
|