Permit Information
Permit NumberBLD16-03010
StatusFinaled
Name RRC CONTRACTORS
Site Address 877 W MAIN ST
Project NameWells Fargo - 1st & 3rd floor
Customer Number 
ePlanReviewYes
Description
**(WELLS FARGO - WELLS FARGO CENTER BUILDING – 1ST & 3RD FLOOR REMODEL)** //Plan modification to update and reconfigure 1st floor offices and open office area locations and create a new storage closet with interior nonbearing walls, removal of select millwork for updated office location, select new millwork, relocation of new lights, electrical and mechanical modifications. 6-1-2017 JG// This building is fully fire sprinklered because it is a high rise. Permit is to remodel 5,200 sq. ft. at the 1st floor and 16,560 sq. ft. of the 3rd floor within an existing 11 story high-rise building. Approval is contingent upon adhering to the approved plans on file. Work to include: @ 1st floor removal of restroom partitions, millwork, select door hardware, light fixtures, select acoustic and gypsum ceiling, construction of new nonbearing walls to create (6) offices, (2) huddle rooms, open office areas, a waiting area, a break area and resource areas, remodel existing restrooms to make ADA accessible, millwork, select new acoustic and gypsum ceiling, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. @ 3rd floor removal of select interior nonbearing walls, select door/door frames, millwork, select stairway leading to 2nd floor, acoustic ceiling, light fixtures, construction of new nonbearing walls to create (10) offices, a conference room, a huddle rooms, a wellness room, (4) resource areas, a break room, a coffee area and open office areas, millwork, floor decking to cover removed stairway, relocate entry card reader, select new relite windows, select new acoustic and gypsum ceiling, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: special inspection required, See attached form #310 in small documents. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection7/19/20197/19/20197/26/2019 PASS
DetailsDave Hannah
DOC - Permit Finaled7/26/20197/26/20197/26/2019APASS
DetailsDave Hannah
BLD-Aging Inspection3/1/20193/1/20193/7/2019 PASS
DetailsDave Hannah
BLD-Final10/17/201810/18/201810/18/2018PPASS
DetailsDave Hannah
Zack Phone #: ###-####
FIRE-Final Inspection10/17/201810/18/201810/18/2018APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Zack Phone #: ###-####
BLD-Final8/25/20178/25/20178/25/2017PPEND
DetailsDave Hannah
Zach Phone #: ###-####3 ok for temp occ
FIRE-Final Inspection8/25/20178/25/20178/25/2017PPART
DetailsTroy Cobbley
A temp on life safety is being given until the access controled egress door is fully functional. All other items appear ok.
BLD-Conference8/24/20178/24/20178/25/2017PPEND
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Ceiling Grid Inspection8/4/20178/4/20178/4/2017PPASS
DetailsDave Hannah
for 1st floor - Zack Phone #: ###-####
BLD-Framing/Rough-in7/7/20177/7/20177/7/2017PPASS
DetailsDave Hannah
Zack Phone #: ###-#### 1st floor
BLD-Ceiling Grid Inspection5/30/20175/30/20175/31/2017PPASS
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Ceiling Grid Inspection5/10/20175/10/20175/11/2017PPASS
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Framing/Rough-in5/4/20175/4/20175/7/2017PPASS
DetailsDave Hannah
Zack Phone #: ###-#### second phase ok
BLD-Conference4/10/20174/10/20174/11/2017PPART
DetailsDave Hannah
Zach Phone #: ###-#### ok to occ first three offices
BLD-Conference4/6/20174/7/20174/7/2017ANR
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Ceiling Grid Inspection3/23/20173/23/20173/23/2017PPART
DetailsDave Hannah
Zack Phone #: ###-#### first phase ok
BLD-Framing/Rough-in3/14/20173/14/20173/14/2017PPART
DetailsDave Hannah
Zack-half of the 3rd floor remodel Phone #: ###-#### ok to cover first phase
BLD-Conference1/27/20171/27/20171/27/2017PPASS
DetailsDave Hannah
Zach Phone #: ###-####
BLD-Conference1/26/20171/26/20171/26/2017PDONE
DetailsJim Sly
Zach Phone #: ###-####
Met with Zach. Need Arch. or Eng. to clarify ......if ....and what rebar required for floor infill. Appr plans does not show sizing, spacing...etc.