BLD-Final | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Mike Jordan
|
|
|
David Phone #: ###-####. ok for perm occ.
|
FIRE-Final Inspection | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Dave Phone #: ###-####
|
BLD-Final | 12/31/2018 | 12/31/2018 | 12/31/2018 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 10/6/2016 | 10/7/2016 | 10/7/2016 | P | NR |
Mike Jordan
|
|
|
Please call ahead for access - David Phone #: ###-####. fire/life/safety failed.
|
FIRE-Final Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 | P | FAIL |
Troy Cobbley
|
|
|
Remove the thumbturn dead bolt from the main exit (keyed is ok) and provide sticker as discussed, remove exit sign from Receiving Area, provide racking permit for storage racks over 8'-0", provide exit signs and approved hardware on the doors as marked by plan review, resubmit plans through the "Fire" review process for the painting being performed in the Equipment Detailing area.
|