BLD-Final | 2/25/2019 | 2/26/2019 | 2/26/2019 | P | PASS |
Mike Jordan
|
|
|
please call Dave for access- Phone #: ###-####. OK for perm occ. A ll issues resolved.
|
FIRE-Final Inspection | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. please call for access, Dave Phone #: ###-####
|
BLD-Final | 12/31/2018 | 12/31/2018 | 12/31/2018 | P | DONE |
Mike Jordan
|
|
|
Needs to recall life/safety final and building final.
|
BLD-Final | 10/6/2016 | 10/7/2016 | 10/7/2016 | P | NR |
Mike Jordan
|
|
|
Please call ahead for access - David Phone #: ###-####. fire/life/safety failed.
|
FIRE-Final Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 | P | FAIL |
Troy Cobbley
|
|
|
Remove dead bolt and repair exit sign in Detail Shop, provide lever hardware and remove dead bolts at the exterior doors with exit signs, provide demarcated exit path per the city approved plans. Provide racking permit for storage racks that exceed 8'-0" in height
|