BLD-Final | 7/26/2017 | 7/27/2017 | 7/27/2017 | A | CANC |
Mike Jordan
|
|
|
Dick Phone #: ###-####
|
FIRE-Final Inspection | 7/26/2017 | 7/26/2017 | 7/26/2017 | P | CANC |
Troy Cobbley
|
|
|
No life safety sign off required.
Dick Phone #: ###-####
|
BLD-Aging Inspection | 3/21/2017 | 3/21/2017 | 3/22/2017 | | PASS |
Mike Jordan
|
|
|
Full permit issued. Wiil final this permit when the Bldg. permit finals.
|
BLD-Foundation | 11/7/2016 | 11/7/2016 | 11/7/2016 | P | PASS |
Mike Jordan
|
|
|
Rebar... As late as possible // Dante Phone #: ###-####. Rebar in slab on grade.
|
BLD-Energy code compliance | 10/25/2016 | 10/25/2016 | 10/25/2016 | P | PASS |
Mike Jordan
|
|
|
Rigid insulation at interior side of stemwall ok.
|
BLD-Energy code compliance | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | NR |
Mike Jordan
|
|
|
Insulation // Dante Phone #: ###-####. Provide additional insulation at footings were they step down. Need 24 inches min.
|
BLD-Foundation | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PART |
Mike Jordan
|
|
|
Dante Phone #: ###-####. perimeter stemwalls, work in progress. Will have special inspection.
|
BLD-Footing | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Footing | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | NR |
Mike Jordan
|
|
|
Dante Phone #: ###-####. No approved plans on site. rescheduled for pm.
|