Permit Information
Permit NumberBLD16-03892
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 8000 S FEDERAL WAY
Project NameMicron B51 R & D Facility
Customer NumberC24074
ePlanReviewYes
Description
C24074 Micron B51 NOTE:**Project Management - Ron Hill** This Permit scope is being pulled from the currently being reviewed scope of work for BLD16-03440 so that construction may proceed with portions of that scope. This new Permit will be specifically for the Exterior Walls, Interior Walls, Fireproofing and Roofing. All other work on this strucure will be completed and reviewed under BLD16-03440. See the attached plan review report for specific conditins of this permit.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/10/20206/10/20206/10/2020PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Dillon Barresi
DOC - Permit Finaled6/10/20206/10/20206/10/2020PPASS
DetailsJim Storey
BLD-Aging Inspection1/15/20201/15/20201/15/2020 PASS
DetailsJim Storey
BLD-Aging Inspection9/3/20199/3/20199/3/2019 PASS
DetailsJim Storey
Expires: 10/19/19
BLD-Framing/Rough-in4/18/20194/22/20194/22/2019PPASS
DetailsJim Storey
steel stud framing // Paul Phone #: ###-#### south west wall framing ok fab walls
BLD-Conference4/3/20194/3/20194/3/2019APEND
DetailsJim Storey
Expires: 01/09/19
BLD-Aging Inspection7/13/20187/13/20187/13/2018 PASS
DetailsJim Storey
wip
BLD-Aging Inspection3/1/20183/1/20183/1/2018 PASS
DetailsJim Storey
ncfi wip
BLD-Aging Inspection10/18/201710/18/201710/18/2017 PASS
DetailsJim Storey
wip ncfi
BLD-Framing/Rough-in6/27/20176/28/20176/27/2017ACANC
DetailsJim Storey
Ken Phone #: ###-####
BLD-Framing/Rough-in6/5/20176/6/20176/6/2017APART
DetailsJim Storey
Ken-2 hour assemblies Phone #: ###-####air ok center shaft wall ok wip/ north wall of 50 pirlin atchment to studs ok/ elavator walls ok/ south east st ok to complet.
BLD-Framing/Rough-in5/16/20175/17/20175/17/2017APASS
DetailsJim Storey
Contact Jake Turnbough to look at the exterior framing on the west side of the building. Phone #: ###-#### Inspection requested via web by Jeremy Richardson stair wall/elavator exterior wall ok
BLD-Framing/Rough-in5/9/20175/9/20175/9/2017PFAIL
DetailsJim Storey
c/n provide headers requred for return air wall penatrations not on plan for load and deflection// need engenery report to verrify exterior foam insulation.
BLD-Framing/Rough-in4/10/20174/11/20174/11/2017AFAIL
DetailsJim Storey
Ken Phone #: ###-#### wall defeltion stud removal at duct pentrations/ fire stopping listings from all trades for penatrating idems and rattings, type of matrial used/door listings and aplactions 3 hr/ gyp to concrete rated joints.
BLD-Framing/Rough-in3/17/20173/20/20173/20/2017APASS
DetailsJim Storey
Ken Phone #: ###-#### random areas
BLD-Framing/Rough-in3/15/20173/16/20173/16/2017ACANC
DetailsMike Jordan
Interior framing, call ahead for access - Ben Phone #: ###-####. Moved to Monday per contractor.
BLD-Framing/Rough-in2/22/20172/23/20172/23/2017APASS
DetailsJim Storey
Ken Phone #: ###-#### level 10 29-32/ab tgm,com ok //level 20 polish rm ok
BLD-Conference2/22/20172/23/20172/23/2017ADONE
DetailsJim Storey
Ken Phone #: ###-####
BLD-Conference2/22/20172/23/20172/23/2017APART
DetailsJim Storey
Talk about the roof parapet cap on non rated walls. Contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson fire treated required
BLD-Framing/Rough-in2/22/20172/22/20172/22/2017PCANC
DetailsMike Jordan
Ken Phone #: ###-####
BLD-Conference2/21/20172/22/20172/22/2017ACANC
DetailsDave Hannah
Talk about the roof parapet cap on non rated walls. Contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Framing/Rough-in1/31/20171/31/20171/31/2017PPASS
DetailsJim Storey
Ken Phone #: ###-#### riser rm 10/office space 10 walls ok/east interior sheet metal ok
BLD-Wall cover1/24/20171/25/20171/25/2017APART
DetailsJim Sly
South wall framing for wall cover contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
South Exterior wall.....Level 30 OK. East 1/2 of South Exterior wall.....Level 20........OK.
BLD-Framing/Rough-in1/20/20171/23/20171/23/2017APART
DetailsJim Storey
Ken Phone #: ###-#### wall cover ok at level 10 1819 tg/ c/n s line provide detail for sline/u.817.8 details for firewall and colum protection
BLD-Other1/16/20171/17/20171/18/2017APART
DetailsDave Hannah
CMU wall and re bar before wall is filled with concrete. Phone #: ###-#### Inspection requested via web by Christophe Haynes talked with contractor he will get spec inspection on rebar and grouting
BLD-Conference1/13/20171/13/20171/13/2017PPART
DetailsJim Storey
stock office 130 meetting recieved ul listing/ walked job with stock/ pending resolve to design isues at beams and colums in 2hr north wall/ vert protection at bearing in fab to be fixed/ stair enclosers framing defencies pointed out to stock.
BLD-Framing/Rough-in1/12/20171/13/20171/13/2017APASS
DetailsJim Storey
Framing inspection for the South West stair. Contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson
BLD-Other12/29/201612/29/201612/30/2016PPASS
DetailsJim Storey
Water proofing // James Phone #: ###-#### south east penatrations ok
BLD-Framing/Rough-in12/27/201612/28/201612/28/2016APART
DetailsJim Storey
Ken Phone #: ###-#### sub mit listing for 2 hr wall/ colums in 2 hr wall not per plan rfi as to how to build./colum screw sch. 12 max/ expation joint in 2hr wall and concrete wall needed prior to instalation.
BLD-Wall cover12/22/201612/23/201612/23/2016ANH
DetailsJim Storey
Ken Phone #: ###-#### no reply
BLD-Framing/Rough-in12/22/201612/23/201612/23/2016ANH
DetailsJim Storey
Ken Phone #: ###-#### no reply
BLD-Framing/Rough-in12/21/201612/21/201612/21/2016PPART
DetailsDave Hannah
Ken Phone #: ###-#### basement level wall on grid line s.5 18thru 34 ok to insulate also note 2hr ext fire wall west wall ext done by isi on int by forety int wall still need to see ul listing screw paterion on first layer is 12 oc stager on sec lay ok
BLD-Framing/Rough-in12/16/201612/20/201612/20/2016AFAIL
DetailsJim Storey
Wall framing inspection Contact Neal Mays Phone #: ###-#### Inspection requested via web by Jeremy Richardson c/n BO to review rated 2hr wall covered with out permit and insp. as to how to poceed/ need listing being used submited/rfi from engineer for bearing double stud kings leg cut off west pass thru./ need determanation as to non fire treated wood installed in roof per aproved plan.
BLD-Framing/Rough-in12/8/201612/9/201612/9/2016AFAIL
DetailsJim Storey
Framing for cover contact Neal Mays ay ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Richardson no aproved plan on site and docs.