Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberBLD16-03998
StatusFinaled
Name FOOTHILL CONSTRUCTION
Site Address 1015 E SHAW MOUNTAIN RD
Project NameKelly Hall Duplex
Customer NumberCAA16-00172
ePlanReviewYes
Description
*ESC issue to be resolved prior to final* (1015 E. Shaw Mountain Rd/1012 E. Logan St.) Permit for the construction of a new three story 3,555 sq. ft. duplex. The front unit is approximately 2,187 sq. ft. with 3 bedrooms, 3 bathrooms, and a 729 sq. ft. garage. The rear unit is approximately 1,437 sq. ft. with 2 bedrooms, and 1.5 bathrooms. All work per the approved plans, and any notations. R-1C zoning and setbacks per planning. **DAF**

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/25/20194/25/20194/25/2019PPASS
DetailsDave Hannah
David Phone #: ###-####
DOC - Permit Finaled4/25/20194/25/20194/25/2019PPASS
DetailsDave Hannah
BLD-Final4/3/20194/4/20194/4/2019ANR
DetailsDave Hannah
Dave Phone #: ###-####
BLD-Aging Inspection4/3/20194/3/20194/4/2019 PEND
DetailsDave Hannah
BLD-Aging Inspection4/4/20194/4/20194/4/2019 PEND
DetailsDave Hannah
BLD-Foundation11/20/201811/20/201811/20/2018PPASS
DetailsDave Hannah
Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing11/14/201811/15/201811/15/2018APASS
DetailsDave Hannah
Call prior to going Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Other8/13/20188/14/20188/14/2018APASS
DetailsDave Hannah
fire sheetrock // Dave Phone #: ###-####
BLD-Energy code compliance8/6/20188/6/20188/6/2018PPASS
DetailsDave Hannah
Dave Phone #: ###-####
BLD-Framing/Rough-in7/25/20187/25/20187/26/2018PPASS
DetailsDave Hannah
Dave Phone #: ###-####
BLD-Framing/Rough-in7/20/20187/23/20187/23/2018APART
DetailsDave Hannah
David Phone #: ###-#### draft stop party and furred out walls drill hold downs ok to spray foam
BLD-Wall Bracing5/22/20185/23/20185/23/2018APART
DetailsDave Hannah
Dave Phone #: ###-#### ok to cover third floor ext wall missing some fl/fl strapes and hold downs ok to set windows
BLD-Conference4/2/20184/3/20184/3/2018ADONE
DetailsDave Hannah
Dave-framing consult Phone #: ###-####
BLD-Foundation12/15/201712/15/201712/15/2017APASS
DetailsDave Hannah
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
BLD-Footing11/20/201711/21/201711/21/2017APASS
DetailsDave Hannah
Early as possible - Wes Phone #: ###-####
BLD-Footing11/15/201711/15/201711/16/2017PCANC
DetailsDave Hannah
As late as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro