BLD-Final | 4/11/2018 | 4/11/2018 | 4/11/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Aging Inspection | 2/20/2018 | 2/20/2018 | 2/20/2018 | | PEND |
Mike Jordan
|
|
|
|
BLD-Final | 12/20/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Will be ok for perm occ. once zoning and public works signs perm.
|
FIRE-Final Inspection | 12/20/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Energy code compliance | 10/13/2017 | 10/16/2017 | 10/16/2017 | A | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Framing/Rough-in | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Wall Bracing | 7/5/2017 | 7/5/2017 | 7/5/2017 | P | PASS |
Mike Jordan
|
|
|
Shear // Marty Phone #: ###-####
|
BLD-Wall Bracing | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | FAIL |
Mike Jordan
|
|
|
Marty Phone #: ###-####. Provide RFI from engineer showing that the STDH 14 holdowns are adequate in leiu of the holddowns shown on approved plans. Shhet S2.2 notes that staples shall not be substituted for nails ot shear wall locations. Missing one holddown. Correction notice put with approved plans.
|
BLD-Footing | 6/9/2017 | 6/9/2017 | 6/9/2017 | P | PASS |
Brandon Shaw
|
|
|
Marty Phone #: ###-####
|
BLD-Footing | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | FAIL |
Dave Hannah
|
|
|
Marty Phone #: ###-#### as per plans ftgs should be 24x10 they are not
|
BLD-Energy code compliance | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Mike Jordan
|
|
|
Marty Phone #: ###-####. Rigid insulation on stemwalls interior side under slab on grade.
|
BLD-Foundation | 5/25/2017 | 5/25/2017 | 5/25/2017 | P | PASS |
Mike Jordan
|
|
|
Marty Short Phone #: ###-####
|
BLD-Footing | 5/19/2017 | 5/22/2017 | 5/22/2017 | A | PASS |
Mike Jordan
|
|
|
Marty Phone #: ###-####
|