Information based on query as of Wednesday, May 15, 2024.
Permit Information
Permit NumberBLD17-00944
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 7607 W GRATZ DR
Project NameLyle Pearson Mercedes Remodel
Customer Number 
ePlanReviewYes
Description
(LYLE PEARSON MERCEDES) 07/17/18 PLAN MODIFICATION TO RETAIN EXTERIOR STAIRS, ADD BREAK ROOM SINK, RELOCATE/ADD INTERIOR WINDOWS. REVISED HVAC, ELECTRICAL, PLUMBING. JAR. **This building is not Fire Sprinklered. Permit to build exterior walls to enclose 494 sq. ft. of covered building area and remodel the existing space. Work to include: demo of existing interior non-bearing wall; new exterior walls, glazing, and doors; new mechanical; new interior stair and ADA lift, non-bearing interior walls, doors, cabinetry; new lights; and new interior finishes in compliance with Ch. 8 of the 2012 IBC. All work to be done per the approved plans and applicable codes and ordinances. Proposed canopy shown in drawings is under separate permit BLD17-01452. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/7/20196/10/20196/10/2019APASS
DetailsMike Jordan
Call when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton. All issues resolved. OK for perm occ.
DOC - Permit Finaled  6/10/2019 DONE
final passed 6-10-19
BLD-Final5/9/20195/10/20195/10/2019APART
DetailsMike Jordan
Call when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton. Ok for temp occ. Needs tempered glazing on side light and provide toilet flusher on turning side.
FIRE-Final Inspection5/9/20195/9/20195/9/2019PPASS
DetailsTroy Cobbley
Life safety passed.. Exit signs have been replaced. Phone #: ###-#### Inspection requested via web by Bob Thornton
FIRE-Final Inspection5/1/20195/2/20195/2/2019AFAIL
DetailsTroy Cobbley
Repair the exit signs and provide the exit discharge light as per plans. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Framing/Rough-in2/5/20192/6/20192/6/2019APASS
DetailsMike Jordan
Bob Phone #: ###-####-please call when on way. LVL header or new opening.
BLD-Framing/Rough-in1/10/20191/10/20191/10/2019PPASS
DetailsMike Jordan
Bob Phone #: ###-####. Interior steel stud and wood framed walls, lintels and headers mercedes recieing area.
BLD-Framing/Rough-in7/19/20187/20/20187/20/2018APASS
DetailsMike Jordan
Bob Phone #: ###-####. Interior steel stud framed walls and hardlids ok at service lounge/service writers area.
BLD-Footing4/27/20184/30/20184/30/2018PPASS
DetailsMike Jordan
Late afternoon please. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Footing4/26/20184/27/20184/27/2018ACANC
DetailsMike Jordan
MTI epoxy bolt at 8:00 am. Concrete is scheduled for noon. Phone #: ###-#### >> Inspection requested via web by Bob Thornton Inspection cancelled from web by: Bob Thornton
BLD-Foundation4/24/20184/25/20184/25/2018APASS
DetailsMike Jordan
Pour foundation wall at 10:00 am Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Footing4/24/20184/24/20184/24/2018PPASS
DetailsMike Jordan
Plans indicate no inspection required. Is that correct? Phone #: ###-#### Inspection requested via web by Bob Thornton