Description
(UNIT 401 – ASPEN LOFTS – TYPE B DWELLING UNIT) The fire sprinkler system is used for high rise and for occupancy. To convert an existing 343 square foot maintenance room with a toilet room located on the 4th story and constructed under shell permit BLD06-02303 to a residential Type B dwelling unit and to expand it by about 81 square feet to a total floor area of about 425 square feet. This dwelling unit is required to comply as a Type B dwelling unit. The toilet room, toilet, toilet room sink, shower, kitchen sink, kitchen appliances, and kitchen cabinets are required to comply with Type B dwelling unit accessibility to the disabled provisions. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/18/20184/19/20184/19/2018APASS
DetailsDave Hannah
Call 15 minutes before to meet there **PLEASE CHECK FOR MEC WORK OR NOT TOO. THANK YOU** Scott Phone #: ###-#### no mec done all mec was installed at time of bldg construction
FIRE-Final Inspection4/17/20184/18/20184/18/2018PPASS
DetailsJim Page
No fire sprinkler modifications required, no fire alarm modifications required, fire extinguisher is in common area with a current inspection tag. Final life fire safety inspection for area of work complete.
BLD-Final4/2/20184/3/20184/3/2018ANR
DetailsDave Hannah
Scott Kimball-call for access Phone #: ###-####
BLD-Framing/Rough-in3/16/20183/19/20183/23/2018PPASS
DetailsDave Hannah
Scott Phone #: ###-####
BLD-Conference3/6/20183/8/20183/22/2018APASS
DetailsDave Hannah
Status? Steve @ ###-#### work in progress
BLD-Conference1/11/20181/16/20181/17/2018PNH
DetailsDave Hannah
Project status? Attempt access during office hours. no one on site
BLD-Conference10/31/201711/1/201711/3/2017PPEND
DetailsDave Hannah
Status? no access
BLD-Other8/23/20178/24/2017 A 
DetailsDave Hannah
Check status?