Permit Information
Permit NumberBLD17-01371
StatusFinaled
Name HC COMPANY INC
Site Address 11311 W CHINDEN BLVD
Project NameSykes Remodel
Customer Number 
ePlanReviewYes
Description
(SYKES - HP CAMPUS B8) (08/10/2017 PLAN MODIFICATION FOR REVISED DOOR SCHEDULE TO REFLECT ACTUAL CONDITIONS FOR NEW AND EXISTING EGRESS DOORS). **Permit is to remodel 32,517 sq ft of the existing 58,656 sq ft third floor tenant space in Building B8 on the HP Campus. This permit is approved contingent upon adhering to the approved plans on file. Work to include: demo of existing non-bearing interior walls; electrical, mechanical and plumbing modifications; new kitchenette and locker room; new doors, interior windows, and new finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/17/201710/18/201710/18/2017APASS
DetailsJim Sly
Jason Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection10/17/201710/17/201710/17/2017PPASS
DetailsTroy Cobbley
Life safety passed

Jason Phone #: ###-####
BLD-Framing/Rough-in8/30/20178/31/20178/31/2017APASS
DetailsJim Sly
Jason Phone #: ###-####
BLD-Final8/10/20178/11/20178/11/2017APART
DetailsJim Sly
temp occ // Jason Phone #: ###-####
OK for Temp. Occ. under the conditions per Julie Romig and Jason Blais.
BLD-Final8/10/20178/10/20178/11/2017ACANC
DetailsJim Sly
FIRE-Final Inspection8/10/20178/11/20178/11/2017APART
DetailsTroy Cobbley
Phase B (North East Quadrant) life safety is passed. Will need the door mag request to exit buttons modified

temp occ // Jason Phone #: ###-####
BLD-Conference7/27/20177/28/20177/27/2017APART
DetailsJim Sly
Jason Phone #: ###-####
See fire inspectors previous notes.
FIRE-Final Inspection7/26/20177/27/20177/27/2017APART
DetailsTroy Cobbley
Phase 1 (northwest quadrant) life safety passed. Plans need to be resubmitted for the door hardware as discussed.
FIRE-Final Inspection7/25/20177/26/20177/26/2017AFAIL
DetailsTroy Cobbley
Todays inspection was for Phase 1 (north west quadrant). The project related fire alarm permit failed. Also I noted that the marked and unmarked egress doors from this area all have door magnets did not release on activation of the fire alarm system and are missing the rex (sensors) and per the review notes there is a 2016 BLD that did not allow the use of mags on the doors. So I'm requesting that the applicant provide a plan modification that gives approval to the requested locking arrangement. Also the egress plan has not been approved by the building code official and I noted that exiting will be going through construction areas from both required exits.

Jason Phone #: ###-####
BLD-Framing/Rough-in6/19/20176/20/20176/20/2017APASS
DetailsJim Sly
Jason Phone #: ###-####
BLD-Framing/Rough-in6/19/20176/19/20176/19/2017PCANC
DetailsDave Hannah
Jason Phone #: ###-####