BLD-Final | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Tony Young
|
|
|
Tony, Grading has been signed off. Please issue the building C of O. Let me know if you need anything further. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
DOC - Permit Finaled | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 7/17/2018 | 7/18/2018 | 7/18/2018 | A | PEND |
Tony Young
|
|
|
Final Grading and Erosion control inspection. Please contact Steve to arrange meeting time. thanks, ###-####. steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Final | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | PEND |
Tony Young
|
|
|
Hi! Looking to see if we can do a Temp-Certificate of Occupancy. Trying to finish up landscape this week to get ‘Final’ next week. Please call with any issues. Thx Kim Phone #: ###-#### Inspection requested via web by Steve Hanson,, all looks ok,, needs firecaulking,, handrail extensions to be flush,, hillside signoff from PW,,
|
BLD-Other | 5/23/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Tony Young
|
|
|
block walls are built and we are ready to fill with concrete. Please inspect for approval to pour. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Foundation | 5/22/2018 | 5/22/2018 | 5/22/2018 | P | PART |
Tony Young
|
|
|
Inspection for block walls for grading. Inspection prior to pour of concrete in blocks. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, work ion progress,, talked w/ masons helper
|
BLD-Other | 5/22/2018 | 5/22/2018 | 5/22/2018 | A | PART |
Tony Young
|
|
|
Inspection for block walls for grading. Inspection prior to pour of concrete in blocks. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson/// needs to finish rebar verticals and tie in to existing wall
|
BLD-Other | 5/2/2018 | 5/3/2018 | 5/3/2018 | A | PART |
Tony Young
|
|
|
Inspection for re bar and block placement for retaining walls near lower level garage. Wanted you to see the re bar prior to concrete pour. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, rebar ok,, need to clean excess mortar out of the cells prior to grouting,, work in progress,, ok
|
BLD-Other | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PART |
Dave Hannah
|
|
|
Inpection for rebar in wall block prior to pouring concrete. Also, inspection of sheetrock layer behind T;G in soffits. Please coordinate for inspection around 11am to noon if possible. siders will be starting tomorrow and will hang T;G right after the inspection. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson soffits ok cmu retanning wall first two courses ok
|
BLD-Other | 3/30/2018 | 4/3/2018 | 4/3/2018 | A | PART |
Tony Young
|
|
|
Inspection of T;G material to be installed on soffits to verify the ''HT'' Heat treated stamp on the product.
2 piles of material. The untreated is for interior of the home.
Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson,, work in progress on drywall soffit,, ok so far
|
BLD-Footing | 3/29/2018 | 3/30/2018 | 3/30/2018 | P | PEND |
Tony Young
|
|
|
Annie-prefers before 2pm Phone #: ###-####,, needs soils report for retaining wall
|
BLD-Footing | 3/28/2018 | 3/29/2018 | 3/30/2018 | P | PEND |
Tony Young
|
|
|
Annie-prefers before 2pm Phone #: ###-####,, need soils report
|
BLD-Foundation | 3/9/2018 | 3/14/2018 | 3/14/2018 | A | PART |
Tony Young
|
|
|
Annie Phone #: ###-####,, driveway retaining walls,, will need to have civil engineer resubmit to hillside dept. for approval prior to final if different from original approval
|
BLD-Foundation | 3/7/2018 | 3/9/2018 | 3/9/2018 | A | NR |
Tony Young
|
|
|
Annie Phone #: ###-####
|
BLD-Foundation | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PART |
Tony Young
|
|
|
Annie Phone #: ###-####,, work in progress on the retaining walls,, paper plans not on site
|
BLD-Footing | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 2/20/2018 | 2/22/2018 | 2/22/2018 | A | NR |
Tony Young
|
|
|
late AM/Early pm? // pouring at 1 // Annie Phone #: ###-####
|
BLD-Energy code compliance | 1/30/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Brandon Shaw
|
|
|
OK to cover
|
BLD-Framing/Rough-in | 1/25/2018 | 1/26/2018 | 1/26/2018 | P | PART |
Tony Young
|
|
|
Preliminary foam install of draft stop on lower garage area, requested by Dave Hannah during framing inspection. Thank you, steve 208.850.8424 Phone #: ###-#### Inspection requested via web by steve hanson,, The draft stop in garage area is OK.
|
BLD-Framing/Rough-in | 1/23/2018 | 1/25/2018 | 1/25/2018 | P | PASS |
Dave Hannah
|
|
|
Approved plan near fireplace. If you can, please call ###-#### with approximate inspection time and i will try to meet you there with the framer. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Wall Bracing | 1/23/2018 | 1/25/2018 | 1/25/2018 | P | PASS |
Dave Hannah
|
|
|
Approved plan near fireplace. If you can, please call ###-#### with approximate inspection time and i will try to meet you there with the framer. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Framing/Rough-in | 1/20/2018 | 1/24/2018 | 1/23/2018 | P | CANC |
Tony Young
|
|
|
Wall Bracing and Shear inspections both at the same time please. Plans near fireplace. steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
BLD-Wall Bracing | 1/20/2018 | 1/24/2018 | 1/23/2018 | P | CANC |
Tony Young
|
|
|
Wall Bracing and Shear inspections both at the same time please. Plans near fireplace. steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
BLD-Wall Bracing | 1/18/2018 | 1/22/2018 | 1/20/2018 | P | CANC |
Tony Young
|
|
|
Wall bracing and framing inspection both done today. Plans near fireplace. thank you, steve Phone #: ###-#### >> Inspection requested via web by steve hanson Inspection cancelled from web by: steve hanson
|
BLD-Framing/Rough-in | 1/18/2018 | 1/19/2018 | 1/19/2018 | P | FAIL |
Tony Young
|
|
|
Shear and framing inspection both requested for today. Plans on site near fireplace. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson// c/n posted
|
BLD-Wall Bracing | 1/17/2018 | 1/18/2018 | 1/19/2018 | P | PEND |
Dave Hannah
|
|
|
Shear inspection. will place another copy of Performance Engineering letter in with the approved plan for you. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Wall Bracing | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | FAIL |
Jim Storey
|
|
|
Shear inspection please. Plan on site near fireplace. thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Wall Bracing | 1/13/2018 | 1/16/2018 | 1/16/2018 | A | NR |
Jim Storey
|
|
|
Shear inspection please. contact steve hanson with any questions or comments at 208.850.8424. thank you. Phone #: ###-#### Inspection requested via web by steve hanson
|
BLD-Footing | 12/1/2017 | 12/4/2017 | 12/4/2017 | A | DONE |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/20/2017 | 11/21/2017 | 11/21/2017 | P | PART |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo ,, garage area ok
|
BLD-Foundation | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 9/19/2017 | 9/20/2017 | 9/20/2017 | A | PASS |
Tony Young
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 9/18/2017 | 9/19/2017 | 9/19/2017 | P | FAIL |
Mike Jordan
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo . No city approved plans or engineering on site. No inspection was conducted.
|
BLD-Other | 8/31/2017 | 8/31/2017 | 9/1/2017 | P | PASS |
Dave Hannah
|
|
|
Erosion Control Inspection. Contact Mike Winkle with questions 208.573.9143. Phone #: ###-#### Inspection requested via web by steve hanson
|