Permit Information
Permit NumberBLD17-02012
StatusFinaled
Name CONGER MANAGEMENT GROUP
Site Address 7455 W SWIFT LN
Project Namecole storage BLDG G
Customer Number01937 & 02006 TO 02018
ePlanReview 
Description
(COLE SELF STORAGE PARTNERS, LLC / DBA WISE SPACE STORAGE – BUILDING G) (***14 BUILDING PERMITS UNDER BLD17-01937 IN EPLAN*** Permit to construct a new 10,750 sq. ft. storage building (83 storage units) and related site improvements. Scope of work includes: construction of a slab on grade concrete, concrete foundation, construction of steel stud framed exterior walls with metal siding, metal roof purlins with a metal roof, metal storage unit partition panels, installation of new overhead doors, new electrical, site work, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. The building is not fire sprinklered. Note: Special Inspections Required see form 310. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/20/20186/21/20186/21/2018PPASS
DetailsJim Sly
Steve Phone #: ###-####
FIRE-Final Inspection6/20/20186/21/20186/21/2018APASS
DetailsTroy Cobbley
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.

Steve Phone #: ###-####
BLD-Final6/5/20186/7/20186/7/2018APART
DetailsJim Sly
Steve Phone #: ###-####
Temp. OK.
FIRE-Final Inspection6/5/20186/6/20186/6/2018PPART
DetailsTroy Cobbley
A temporary occupancy is being given until the permanant building designations have been mounted (A, B, C...ect.). The west most fire hydrant is being rotated per the fie captain.

Steve Phone #: ###-####
FIRE-Final Inspection6/1/20186/4/20186/4/2018PFAIL
DetailsTroy Cobbley
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)


Steve Phone #: ###-####
FIRE-Final Inspection5/29/20185/30/20185/30/2018AFAIL
DetailsTroy Cobbley
exit signs/emergency lights/exit discharge lights passed. Fire extinguishers passed. Can not sign off until the fire lane, fire hydrant..ect items have been corrected.


Steve Phone #: ###-####
BLD-Final5/23/20185/30/20185/30/2018ANR
DetailsJim Sly
Please call ahead for access - Steve Phone #: ###-####
FIRE-Final Inspection5/23/20185/29/20185/29/2018AFAIL
DetailsTroy Cobbley
This was for a partial inspection. Contractor is missing all of the small documents/review comments. I went to the job site twice before I was able to make contact. I noted that the fire dept access (20'-0") has not been met in many locations especially at the south end of the project site, there are possible turning radius issues in the same location. Non of the fire hydrants meet the minimum 3'-0" clearance rule, non of the building have the A, B, C designations, the main gate does not meet the 20' min. clearance and the opticon has not been installed/tested, there is a gate just in side the entrance on the right that does not meet the 20' min. clearance., no fire extinguishers have been installed in the storage areas, building address appears to be partialy blocked. Due to time constraints I was unable to test the exit signs/emergency lights/exit discharge lights for the storage buildings with interior corridors. Single action hardware needs to be installed on the office doors as discussed and exit signs/emergency lights/exit discharge lights are missing from the office. I spoke to both Ron and Adele and it appears a plan modification will be required showing the changes to the fire access lane widths/possible radius changes especially the large changes at the south end of the project

Please call ahead for access - Steve Phone #: ###-####