BLD-Final | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
DOC - Permit Finaled | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/14/2017 | 12/15/2017 | 12/15/2017 | P | FAIL |
Mike Jordan
|
|
|
Garage door code 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Handrail mounted above the 38 inch max height allowed. Correction notice posted.
|
BLD-Energy code compliance | 10/23/2017 | 10/24/2017 | 10/24/2017 | P | PASS |
Mike Jordan
|
|
|
Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PASS |
Brandon Shaw
|
|
|
See notes for wall bracing
|
BLD-Wall Bracing | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PASS |
Brandon Shaw
|
|
|
Framing corrections sat., Wall Bracing-Panels covered with house wrap and/or insulation- blocking appears to be in place at all panels Nail straps be installation instructions, see red paint
|
BLD-Energy code compliance | 10/23/2017 | 10/24/2017 | 10/23/2017 | A | CANC |
Mike Jordan
|
|
|
Foam seal inspection >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
|
BLD-Energy code compliance | 10/20/2017 | 10/23/2017 | 10/23/2017 | P | CANC |
Mike Jordan
|
|
|
Inspection requested via web by Joel Hirtle
|
BLD-Framing/Rough-in | 10/20/2017 | 10/23/2017 | 10/23/2017 | P | FAIL |
Mike Jordan
|
|
|
Inspection requested via web by Joel Hirtle. Install the 2x10 scab for BG2 box truss as shown on truss enginering. No wall bracing inspection. Remove tyvek for wall bracing inspection. Correction notice posted. Ok to insulate.
|
BLD-Footing | 9/21/2017 | 9/22/2017 | 9/22/2017 | A | PASS |
Mike Jordan
|
|
|
Please schedule for first thing AM. Interior shovel footings before Flatwork pour.
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Interior thickend footings ok.
|
BLD-Foundation | 9/7/2017 | 9/8/2017 | 9/8/2017 | P | DEFR |
Mike Jordan
|
|
|
Dane Phone #: ###-####. Concrete already placed in stemwall when on site. concrete contractor to acept liability for foundation system.
|
BLD-Footing | 9/6/2017 | 9/7/2017 | 9/7/2017 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 9/5/2017 | 9/6/2017 | 9/6/2017 | P | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|