BLD-Conference | 9/30/2019 | 10/4/2019 | 10/3/2019 | A | CANC |
Tell Riley
|
|
|
Cesar Phone #: ###-####//check on blower door results///CO was issued//
|
BLD-Blower Door Test Results | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | DONE |
Tell Riley
|
|
|
3.76 ACH 50 839 CFM @ 50 PA
|
BLD-Final | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Tell Riley
|
|
|
CESAR Phone #: ###-####
|
DOC - Permit Finaled | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PART |
Tell Riley
|
|
|
Cesar Phone #: ###-####//dweling is complete//life safety and trades all signed off//cesar will get blower door results and call back in for final//
|
BLD-Aging Inspection | 6/11/2019 | 6/11/2019 | 6/13/2019 | | DONE |
Tell Riley
|
|
|
Expires: 07/27/19
|
BLD-Aging Inspection | 6/12/2019 | 6/12/2019 | 6/12/2019 | | DONE |
Tell Riley
|
|
|
Expires: 07/27/19
|
BLD-Energy code compliance | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to cover...
|
BLD-Framing/Rough-in | 1/18/2019 | 1/18/2019 | 1/22/2019 | P | PASS |
Jim Sly
|
|
|
Cesar Phone #: ###-####
|
BLD-Wall Bracing | 8/17/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Jim Sly
|
|
|
Cesar Phone #: ###-####
|
BLD-Framing/Rough-in | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | NR |
Jim Sly
|
|
|
Araujo Phone #: ###-#### Need all trade R/I approvals
|