BLD-Final | 5/28/2018 | 5/29/2018 | 5/29/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp occ. Will be ok for perm oc..once zoning signs perm. No card on site to sign.
|
BLD-Final | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
FIRE-Final Inspection | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PASS |
Jim Page
|
|
|
Hole next to fire sprinkler head has been filled, final life fire safety inspection complete.
Phone #: ###-#### Inspection requested via web by David Scaggs
|
FIRE-Final Inspection | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | FAIL |
Troy Cobbley
|
|
|
Holes around the sprinkler head upstairs in 102. Why? Pipe under stress?
Phone #: ###-#### Inspection requested via web by David Scaggs
|
FIRE-Final Inspection | 5/16/2018 | 5/16/2018 | 5/16/2018 | P | FAIL |
Jim Page
|
|
|
FIR permits for fire sprinkler and fire alarm need to be finaled before life fire safety inspection can be performed.
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Energy code compliance | 2/23/2018 | 2/23/2018 | 2/23/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Framing/Rough-in | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs
|
BLD-Wall Bracing | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD-Footing | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Mike Jordan
|
|
|
Interior footings Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD-Energy code compliance | 1/1/2018 | 1/2/2018 | 1/2/2018 | A | PART |
Mike Jordan
|
|
|
Foundation insulation Phone #: ###-#### Inspection requested via web by Marty Short. Rigid insualtion on iteior side of stemwall ok. Noted to contractor that prior to backfill operations, areas to be backfilled must be free of snow and ice and not be frozen. Baclfill materials also to not be frozen.
|
BLD-Foundation | 12/20/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Mike Jordan
|
|
|
Concrete scheduled for 2pm Phone #: ###-#### Inspection requested via web by Marty Short
|
BLD-Footing | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | PASS |
Mike Jordan
|
|
|
Concrete scheduled for 2pm Phone #: ###-#### Inspection requested via web by Marty Short
|