Permit Information
Permit NumberBLD17-02428
StatusFinaled
Name SUMMIT DEVELOPMENT INC
Site Address 1363 S BIRD ST
Project NameCimarron Apartments
Customer NumberBLD17-02410 - BLD17-02429
ePlanReviewNo
Description
(CIMARRON APARTMENTS 6-PLEX) (20 PERMITS FILED UNDER BLD17-02410 IN EPLANREVIEW)(DRH17-00144) **Permit for the construction of a 20 multi-family buildings consisting of 80 units total in (1) six-plex, (1) duplex, and (18) four-plexes. All buildings are reviewed under the IBC and are required to be fire sprinklered. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/10/20187/10/20187/10/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs. Ok for temp oc. Will be ok for perm occ. once zoning signs perm. No card on site to sign.
BLD-Final7/9/20187/9/20187/9/2018PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by David Scaggs Inspection cancelled from web by: David Scaggs
BLD-Final7/3/20187/3/20187/3/2018PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs. Noted some 20 min doors not installed, all 20 min doors need to be self closing. Fire caulk all penetrations in garages. Still need to verifiy 1 hr. wall continuity in garage to bottom of roof deck.
BLD-Final7/2/20187/2/20187/2/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs. Needs mech. final.
FIRE-Final Inspection6/28/20186/28/20186/28/2018APASS
DetailsTroy Cobbley
Life safety passed

Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Energy code compliance4/12/20184/12/20184/12/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Energy code compliance4/11/20184/11/20184/11/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Framing/Rough-in4/10/20184/10/20184/10/2018PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs. Provide revised truss engineering, fireblock double common walls at 2nd. floor.
BLD-Framing/Rough-in4/9/20184/9/20184/9/2018PNR
DetailsMike Jordan
Pending fire sprinkler inspection Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Wall Bracing3/29/20183/29/20183/29/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Wall Bracing3/28/20183/28/20183/28/2018PNR
DetailsDave Hannah
Will have approved set of plans onsite. Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Wall Bracing3/27/20183/27/20183/27/2018PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by David Scaggs
BLD-Footing2/15/20182/15/20182/15/2018APASS
DetailsMike Jordan
Interior footings, concrete is scheduled for 9am Phone #: ###-#### Inspection requested via web by Marty Short
BLD-Footing2/2/20182/2/20182/2/2018PDEFR
DetailsMike Jordan
Interior footings, concrete is scheduled for 1pm Phone #: ###-#### Inspection requested via web by Marty Short. Concrete already placed when on site.
BLD-Energy code compliance1/24/20181/24/20181/24/2018APASS
DetailsMike Jordan
Foundation insulation Phone #: ###-#### Inspection requested via web by Marty Short
BLD-Foundation1/22/20181/22/20181/22/2018PPASS
DetailsMike Jordan
Concrete is scheduled for 2pm Phone #: ###-#### Inspection requested via web by Marty Short
BLD-Footing1/12/20181/12/20181/12/2018APASS
DetailsMike Jordan
Concrete scheduled for 10am Phone #: ###-#### Inspection requested via web by Marty Short