BLD-Final | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Brandon Shaw
|
|
|
John Phone #: ###-####
|
DOC - Permit Finaled | 8/22/2019 | 8/22/2019 | 8/22/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 8/16/2019 | 8/16/2019 | 8/19/2019 | P | PEND |
Dave Hannah
|
|
|
John Phone #: ###-#### needs returns on handrail
|
BLD-Conference | 6/4/2019 | 6/4/2019 | 6/6/2019 | P | DONE |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Final | 6/5/2019 | 6/5/2019 | 6/5/2019 | A | PART |
Dave Hannah
|
|
|
ok for tco needs to fix handrail in stair tower
|
BLD-Final | 5/30/2019 | 5/31/2019 | 5/31/2019 | A | NR |
Dave Hannah
|
|
|
John Phone #: ###-#### needs four inch lemiters on windows fix handrail in stair tower and opennings in risers
|
FIRE-Final Inspection | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, fire extinguishers are in placed and will be inspected as discussed. Final life fire safety inspection complete.
John Phone #: ###-####
|
BLD-Other | 7/20/2018 | 7/20/2018 | 7/24/2018 | P | PASS |
Dave Hannah
|
|
|
John-sheetrock Phone #: ###-####
|
BLD-Other | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Dave Hannah
|
|
|
energy seal- john Phone #: ###-####
|
BLD-Other | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PASS |
Dave Hannah
|
|
|
fire caluking- john Phone #: ###-#### also framing
|
BLD-Wall Bracing | 7/19/2018 | 7/19/2018 | 7/20/2018 | P | PEND |
Dave Hannah
|
|
|
John-sheetrock Phone #: ###-####
|
BLD-Energy code compliance | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PASS |
Dave Hannah
|
|
|
John Wyman Phone #: ###-####
|
BLD-Energy code compliance | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | PASS |
Dave Hannah
|
|
|
2nd floor // John Phone #: ###-####
|
BLD-Energy code compliance | 7/11/2018 | 7/11/2018 | 7/12/2018 | P | PASS |
Dave Hannah
|
|
|
3rd floor apartment - John Phone #: ###-#### ok to cover
|
BLD-Other | 7/9/2018 | 7/9/2018 | 7/9/2018 | P | PASS |
Dave Hannah
|
|
|
fire colk // John Phone #: ###-#### ok to insulate
|
BLD-Framing/Rough-in | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | NR |
Dave Hannah
|
|
|
John Phone #: ###-#### framing ok but needs to install firestopping
|
BLD-Footing | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####-footings for parking lot
|
BLD-Other | 4/23/2018 | 4/24/2018 | 4/24/2018 | A | PASS |
Dave Hannah
|
|
|
John-Fire wall Phone #: ###-####
|
BLD-Other | 4/16/2018 | 4/16/2018 | 4/17/2018 | P | DONE |
Dave Hannah
|
|
|
Fire sheet rock behind showers- Dawn Phone #: ###-#### needs to sheetrock box for valves
|
BLD-Wall Bracing | 4/13/2018 | 4/13/2018 | 4/16/2018 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to cover ext
|
BLD-Footing | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | NR |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 11/8/2017 | 11/9/2017 | 11/9/2017 | A | PASS |
Dave Hannah
|
|
|
John-pour time 1:00 Phone #: ###-####
|
BLD-Footing | 11/1/2017 | 11/2/2017 | 11/2/2017 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-####
|