BLD-Final | 9/11/2018 | 9/12/2018 | 9/12/2018 | P | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Final | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | CANC |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
FIRE-Final Inspection | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | PASS |
Jim Page
|
|
|
Final life fire safety inspection complete.
Jeff Phone #: ###-####
|
BLD-Aging Inspection | 5/30/2018 | 5/30/2018 | 5/30/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/19/2018 | 3/19/2018 | 3/23/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 1/11/2018 | 1/16/2018 | 1/17/2018 | P | DONE |
Dave Hannah
|
|
|
Robert Phone #: ###-####
|
BLD-Final | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | PART |
Dave Hannah
|
|
|
TCO - Robert Phone #: ###-#### ok for temp occ
|
FIRE-Final Inspection | 1/11/2018 | 1/16/2018 | 1/16/2018 | A | PART |
Jim Page
|
|
|
Partial final inspection for TI space complete, fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Permit will remain in issued status until core/shell garage permit is complete and finaled.
|
BLD-Ceiling Grid Inspection | 1/4/2018 | 1/8/2018 | 1/9/2018 | A | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Energy code compliance | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Dave Hannah
|
|
|
Jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 11/28/2017 | 11/29/2017 | 11/30/2017 | P | PART |
Dave Hannah
|
|
|
Jeff Phone #: ###-#### ok to one side walls and cover ext walls
|