BLD-Final | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Tell Riley
|
|
|
Linden Phone #: ###-####
|
DOC - Permit Finaled | 3/26/2020 | 3/26/2020 | 3/26/2020 | P | PASS |
Tell Riley
|
|
|
hard surface for driveway installed
|
BLD-Final | 2/12/2020 | 2/13/2020 | 2/13/2020 | A | PART |
Tell Riley
|
|
|
LYNDEN Phone #: ###-####//Electircal final complete//building is complete per plans//site plan shows hard surface required for driveway--will need to be installed to complete final//
|
BLD-Aging Inspection | 1/24/2020 | 1/24/2020 | 1/27/2020 | | DONE |
Tell Riley
|
|
|
no contact for final.....
|
BLD-Framing/Rough-in | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Jim Storey
|
|
|
Lyndon Phone #: ###-####
|
BLD-Framing/Rough-in | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | CANC |
Tell Riley
|
|
|
Carl Phone #: ###-####//need to have electrical rough inspection//will check the header for portal frame at framing inspection//
|
BLD-Wall Bracing | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | PART |
Tell Riley
|
|
|
nailing ok//needs to portal frame garage door opening per plans//will chack at framing//
|
BLD-Framing/Rough-in | 8/14/2019 | 8/14/2019 | 8/14/2019 | P | CANC |
Tell Riley
|
|
|
Tom Phone #: ###-####//needs wall bracing//
|
BLD-Foundation | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Tell Riley
|
|
|
Doug Phone #: ###-####//wall rebar ok
|
BLD-Footing | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | PASS |
Tell Riley
|
|
|
Linden Phone #: ###-####//setbacks per plans// rebar installed//
|
BLD-Conference | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | DONE |
Tell Riley
|
|
|
WIDEN- please call for access Phone #: ###-####//advised new permit was needed//foundation changes and setback changes to what was previously permitted//will need to find property pins for setback inspections once new permit is issued//
|