BLD-Aging Inspection | 2/28/2019 | 2/28/2019 | 3/6/2019 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
FIRE-Final Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 | P | PASS |
Jim Page
|
|
|
Final life fire safety inspection for area of work complete.
Pete Phone #: ###-####
|
BLD-Aging Inspection | 12/20/2018 | 12/20/2018 | 12/26/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Wall Bracing | 10/11/2018 | 10/11/2018 | 10/11/2018 | A | CANC |
Dave Hannah
|
|
|
Mike-exterior strap & shear Phone #: ###-####
|
BLD-Aging Inspection | 7/25/2018 | 7/25/2018 | 7/30/2018 | | PEND |
Dave Hannah
|
|
|
|
BLD-Final | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | PART |
Dave Hannah
|
|
|
Pete Phone #: ###-#### ok for tco
|
FIRE-Final Inspection | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PART |
Jim Page
|
|
|
Final life fire safety inspection complete for TCO in requested area of this permit, fire extinguisher is in place with a current inspection tag, fire alarm and fire sprinkler work to be completed with core and shell remodel, commercial cooking hood operational inspection complete, hood fire alarm interface to completed with core and shell fire alarm inspection. Per conversation with Romeo TCO is authorized for 90 days.
|
FIRE-Final Inspection | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | FAIL |
Jim Page
|
|
|
Commercial cooking hood fire suppression system did not pass inspection, FIR permit for hood suppression system needs to be finaled before life fire safety inspection can be completed.
Cody Phone #: ###-####
|
BLD-Final | 5/23/2018 | 5/25/2018 | 5/24/2018 | A | CANC |
Dave Hannah
|
|
|
Cody Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 4/30/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Dave Hannah
|
|
|
Cody Phone #: ###-####
|
BLD-Conference | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
FIRE-Conference | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
|
FIRE-Final Inspection | 4/12/2018 | 4/12/2018 | 4/12/2018 | A | CANC |
Jim Page
|
|
|
|
FIRE-Final Inspection | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | CANC |
Jim Page
|
|
|
Request was for a conference, not a final inspection, this request is cancelled.
|
BLD-Framing/Rough-in | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|
BLD-Conference | 1/26/2018 | 1/29/2018 | 1/29/2018 | A | PASS |
Dave Hannah
|
|
|
Pete Phone #: ###-####
|