Permit NumberBLD17-03581
StatusFinaled
Name TRILOGY DEVELOPMENT INC
Site Address 10038 W OVERLAND RD
Project NamePad Thai House Restaurant
Customer Number 
ePlanReviewYes
Description
(PAD THAI HOUSE RESTAURANT) **Permit for the construction of a new 4,796 sq. ft. restaurant with work to include a concrete foundation, slab on grade floor, and wood framed type VB structure above along with related site improvements, per the approved plans. This building is fully fire sprinklered for A2 occupancy over 100. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/21/20188/21/20188/21/2018PCANC
DetailsMike Jordan
BLD-Final8/20/20188/21/20188/21/2018APASS
DetailsMike Jordan
later morning- Adam Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning signs perm.
FIRE-Final Inspection8/20/20188/21/20188/21/2018APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, hood suppression system inspection complete, knox box is located by main entry. Final life fire safety inspection complete.

early morning- Adam Phone #: ###-####
BLD-Final8/17/20188/17/20188/17/2018PPEND
DetailsMike Jordan
fire finals expected today. Thank you Michael McHargue Phone #: ###-#### Inspection requested via web by Mike McHargue. Walk through. Needs fire/life/safety and public works.
FIRE-Final Inspection8/14/20188/15/20188/15/2018AFAIL
DetailsTroy Cobbley
FIre life safety will be ok to pass when the fire dept access signage is installed and the project related fire alarm, fire sprinkerl and hood suppression system permits are finaled.

Fire/Life/Safety Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Ceiling Grid Inspection7/23/20187/23/20187/23/2018APASS
DetailsBrandon Shaw
Grid Ceiling Inspection. Troy to inspect FS at 7AM this morning.
Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Ceiling Grid Inspection7/19/20187/20/20187/20/2018PNR
DetailsMike Jordan
Adam Phone #: ###-####. Needs fire sprinkler rough in inspection.
BLD-Energy code compliance5/4/20185/4/20185/4/2018PPASS
DetailsMike Jordan
Adam Phone #: ###-####
BLD-Framing/Rough-in5/4/20185/4/20185/4/2018PPASS
DetailsMike Jordan
Adam Phone #: ###-####
BLD-Framing/Rough-in5/2/20185/3/20185/3/2018PPART
DetailsMike Jordan
Adam Phone #: ###-####. Work in progress on installing insulation. Still needs to fix truss and add missed lateral bracing.
BLD-Framing/Rough-in4/30/20185/2/20185/2/2018AFAIL
DetailsMike Jordan
adam Phone #: ###-####. Complete lateral bracing on S3 and S4, A01 trusses. Strap top plate in vestibule at line st penetration. provide approved fix for S2 truss. Ok to insulate.
BLD-Framing/Rough-in4/27/20184/30/20184/30/2018PNR
DetailsMike Jordan
Adam Phone #: ###-####. Nees to complete air seal prior to framing inspection.
BLD-Conference4/11/20184/12/20184/12/2018ADONE
DetailsMike Jordan
Adam Phone #: ###-####
BLD-Wall Bracing3/28/20183/28/20183/28/2018PPASS
DetailsMike Jordan
Adam Phone #: ###-####. STDH10 holdowns ok per the engineer of record and are nailed off.
BLD-Wall Bracing3/27/20183/27/20183/28/2018PPEND
DetailsDave Hannah
Adam Phone #: ###-#### nailing ok but straps not nailed and engineering called out for hd hold downs and crew used straps engineer needs ot aprove
BLD-Other3/20/20183/20/20183/20/2018PDONE
DetailsMike Jordan
roof shear // Adam Joslin Phone #: ###-####
BLD-Other3/16/20183/16/20183/16/2018PPASS
DetailsMike Jordan
roof shear // Adam Phone #: ###-####
BLD-Foundation2/13/20182/13/20182/13/2018PPASS
DetailsMike Jordan
Column bolts and grout Phone #: ###-#### Inspection requested via web by Mike McHargue
BLD-Energy code compliance1/17/20181/17/20181/17/2018PPASS
DetailsMike Jordan
BLD-Energy code compliance1/16/20181/17/20181/17/2018ANR
DetailsMike Jordan
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue. Moved to pm
BLD-Foundation1/12/20181/16/20181/17/2018PDEFR
DetailsMike Jordan
Manuel Phone #: ###-####. Foundation placed yesterday 1-15-18.(holiday) Contractor had special inspection.
BLD-Energy code compliance1/16/20181/16/20181/16/2018PCANC
DetailsMike Jordan
Late PM if possible foundation insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Energy code compliance1/16/20181/16/20181/16/2018ACANC
DetailsMike Jordan
Late AM if possible. Foundation insulation. Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
BLD-Foundation1/11/20181/12/20181/12/2018PCANC
DetailsMike Jordan
Manual Phone #: ###-####
BLD-Foundation1/10/20181/11/20181/11/2018PNR
DetailsMike Jordan
Dane Phone #: ###-####. Cancelled per Dane.
BLD-Footing1/9/20181/10/20181/10/2018PPASS
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing1/8/20181/9/20181/9/2018ACANC
DetailsMike Jordan
Dane Phone #: ###-####