BLD-Final | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Final | 8/20/2018 | 8/21/2018 | 8/21/2018 | A | PASS |
Mike Jordan
|
|
|
later morning- Adam Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once zoning signs perm.
|
FIRE-Final Inspection | 8/20/2018 | 8/21/2018 | 8/21/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, hood suppression system inspection complete, knox box is located by main entry. Final life fire safety inspection complete.
early morning- Adam Phone #: ###-####
|
BLD-Final | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PEND |
Mike Jordan
|
|
|
fire finals expected today. Thank you Michael McHargue Phone #: ###-#### Inspection requested via web by Mike McHargue. Walk through. Needs fire/life/safety and public works.
|
FIRE-Final Inspection | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | FAIL |
Troy Cobbley
|
|
|
FIre life safety will be ok to pass when the fire dept access signage is installed and the project related fire alarm, fire sprinkerl and hood suppression system permits are finaled.
Fire/Life/Safety Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Ceiling Grid Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 | A | PASS |
Brandon Shaw
|
|
|
Grid Ceiling Inspection. Troy to inspect FS at 7AM this morning. Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Ceiling Grid Inspection | 7/19/2018 | 7/20/2018 | 7/20/2018 | P | NR |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Needs fire sprinkler rough in inspection.
|
BLD-Energy code compliance | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 5/4/2018 | 5/4/2018 | 5/4/2018 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 5/2/2018 | 5/3/2018 | 5/3/2018 | P | PART |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Work in progress on installing insulation. Still needs to fix truss and add missed lateral bracing.
|
BLD-Framing/Rough-in | 4/30/2018 | 5/2/2018 | 5/2/2018 | A | FAIL |
Mike Jordan
|
|
|
adam Phone #: ###-####. Complete lateral bracing on S3 and S4, A01 trusses. Strap top plate in vestibule at line st penetration. provide approved fix for S2 truss. Ok to insulate.
|
BLD-Framing/Rough-in | 4/27/2018 | 4/30/2018 | 4/30/2018 | P | NR |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Nees to complete air seal prior to framing inspection.
|
BLD-Conference | 4/11/2018 | 4/12/2018 | 4/12/2018 | A | DONE |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Wall Bracing | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####. STDH10 holdowns ok per the engineer of record and are nailed off.
|
BLD-Wall Bracing | 3/27/2018 | 3/27/2018 | 3/28/2018 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-#### nailing ok but straps not nailed and engineering called out for hd hold downs and crew used straps engineer needs ot aprove
|
BLD-Other | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | DONE |
Mike Jordan
|
|
|
roof shear // Adam Joslin Phone #: ###-####
|
BLD-Other | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Mike Jordan
|
|
|
roof shear // Adam Phone #: ###-####
|
BLD-Foundation | 2/13/2018 | 2/13/2018 | 2/13/2018 | P | PASS |
Mike Jordan
|
|
|
Column bolts and grout Phone #: ###-#### Inspection requested via web by Mike McHargue
|
BLD-Energy code compliance | 1/17/2018 | 1/17/2018 | 1/17/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | NR |
Mike Jordan
|
|
|
Foundation Insulation Phone #: ###-#### Inspection requested via web by Mike McHargue. Moved to pm
|
BLD-Foundation | 1/12/2018 | 1/16/2018 | 1/17/2018 | P | DEFR |
Mike Jordan
|
|
|
Manuel Phone #: ###-####. Foundation placed yesterday 1-15-18.(holiday) Contractor had special inspection.
|
BLD-Energy code compliance | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | CANC |
Mike Jordan
|
|
|
Late PM if possible foundation insulation Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
|
BLD-Energy code compliance | 1/16/2018 | 1/16/2018 | 1/16/2018 | A | CANC |
Mike Jordan
|
|
|
Late AM if possible. Foundation insulation. Phone #: ###-#### >> Inspection requested via web by Mike McHargue Inspection cancelled from web by: Mike McHargue
|
BLD-Foundation | 1/11/2018 | 1/12/2018 | 1/12/2018 | P | CANC |
Mike Jordan
|
|
|
Manual Phone #: ###-####
|
BLD-Foundation | 1/10/2018 | 1/11/2018 | 1/11/2018 | P | NR |
Mike Jordan
|
|
|
Dane Phone #: ###-####. Cancelled per Dane.
|
BLD-Footing | 1/9/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | CANC |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|